Pipe pile vertical butt joint adjusting method
The invention discloses a tubular pile vertical butt joint adjusting method, and relates to the technical field of tubular pile vertical butt joint. When an existing pipe pile is vertically butted, the overall perpendicularity of the pipe pile is difficult to guarantee, and the centering difficulty is high and the efficiency is low. The pipe pile vertical butt joint adjusting method comprises the steps that firstly, the first central horizontal position of an upper end butt joint opening of a sunk pipe pile is obtained, and after a to-be-aligned pipe pile is vertically arranged and aligned with the sunk pipe pile, the second central horizontal position of a lower end butt joint opening of the to-be-aligned pipe pile is obtained; and a horizontal butt joint adjustment strategy of the pipe pile is determined according to the first center horizontal position and the second center horizontal position, an adjustment device is controlled to conduct horizontal alignment adjustment according to the horizontal butt joint adjustment strategy, and after horizontal alignment adjustment operation is completed, a pile falling device is controlled to conduct vertical pile falling butt joint. By judging the relative positions of the two pipe piles in the horizontal direction, the horizontal butt joint adjusting strategy is appointed, the multiple adjusting assemblies are controlled to adjust the horizontal positions of the pipe piles to be aligned, and the butt joint precision and the butt joint efficiency are greatly improved.
本发明公开一种管桩垂直对接调整方法,涉及管桩垂直对接技术领域。现有管桩垂直对接时,难以保证管桩整体垂直度,且对中难度大效率低。管桩垂直对接调整方法,首先获取已沉设管桩的上端对接口的第一中心水平位置,在待对位管桩竖置且与已沉设管桩对位后,获取待对位管桩的下端对接口的第二中心水平位置,根据第一中心水平位置和第二中心水平位置确定管桩的水平对接调整策略,根据水平对接调整策略控制调整装置进行水平对位调整,在水平对位调整作业完成后,控制落桩装置进行竖向落桩对接。通过判断两个管桩在水平方向上的相对位置,指定水平对接调整策略,并控制多个调整组件调节待对位管桩的水平位置,大大提高对接精准度和对接效率。
Pipe pile vertical butt joint adjusting method
The invention discloses a tubular pile vertical butt joint adjusting method, and relates to the technical field of tubular pile vertical butt joint. When an existing pipe pile is vertically butted, the overall perpendicularity of the pipe pile is difficult to guarantee, and the centering difficulty is high and the efficiency is low. The pipe pile vertical butt joint adjusting method comprises the steps that firstly, the first central horizontal position of an upper end butt joint opening of a sunk pipe pile is obtained, and after a to-be-aligned pipe pile is vertically arranged and aligned with the sunk pipe pile, the second central horizontal position of a lower end butt joint opening of the to-be-aligned pipe pile is obtained; and a horizontal butt joint adjustment strategy of the pipe pile is determined according to the first center horizontal position and the second center horizontal position, an adjustment device is controlled to conduct horizontal alignment adjustment according to the horizontal butt joint adjustment strategy, and after horizontal alignment adjustment operation is completed, a pile falling device is controlled to conduct vertical pile falling butt joint. By judging the relative positions of the two pipe piles in the horizontal direction, the horizontal butt joint adjusting strategy is appointed, the multiple adjusting assemblies are controlled to adjust the horizontal positions of the pipe piles to be aligned, and the butt joint precision and the butt joint efficiency are greatly improved.
本发明公开一种管桩垂直对接调整方法,涉及管桩垂直对接技术领域。现有管桩垂直对接时,难以保证管桩整体垂直度,且对中难度大效率低。管桩垂直对接调整方法,首先获取已沉设管桩的上端对接口的第一中心水平位置,在待对位管桩竖置且与已沉设管桩对位后,获取待对位管桩的下端对接口的第二中心水平位置,根据第一中心水平位置和第二中心水平位置确定管桩的水平对接调整策略,根据水平对接调整策略控制调整装置进行水平对位调整,在水平对位调整作业完成后,控制落桩装置进行竖向落桩对接。通过判断两个管桩在水平方向上的相对位置,指定水平对接调整策略,并控制多个调整组件调节待对位管桩的水平位置,大大提高对接精准度和对接效率。
Pipe pile vertical butt joint adjusting method
管桩垂直对接调整方法
AN PENG (author) / SUN YINHAO (author) / ZHAO HUA (author) / LV TIANWEN (author) / WANG WENWEI (author) / SHEN SHENGQIANG (author) / ZHANG CHUNLEI (author) / LYU BINGRONG (author) / DOU SHAOKE (author) / YU XIAOSHI (author)
2023-05-23
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pipe pile splicing butt joint positioning device and construction method thereof