Construction method of station main body structure
The invention discloses a construction method of a station main body structure. The construction method comprises the following steps: constructing a structural bottom plate; the method specifically comprises the steps of base surface treatment, cushion layer and waterproof construction, steel bar binding, formwork installation, concrete pouring and concrete formwork removal and maintenance. Constructing a wall column structure; the construction method specifically comprises the steps of construction joint dabbing, cleaning, waterproofing, steel bar binding, formwork installation, concrete pouring, concrete formwork removal and maintenance. Constructing middle plate and top plate structures; the method specifically comprises the steps of formwork support erection, construction joint treatment, steel bar binding, plug formwork installation, concrete pouring, concrete formwork removal and maintenance. According to the method, construction is easy and convenient, the progress is fast, the technical problems that an existing subway station has construction defects and is poor in overall stability are solved, and the construction quality and efficiency and the overall strength and stability of a station main body structure are greatly improved.
本发明公开了一种车站主体结构的施工方法,包括以下步骤:结构底板施工;具体包括:基面处理,垫层及防水施工,钢筋绑扎,模板安装,混凝土浇筑,混凝土拆模和养护;墙柱结构施工;具体包括:施工缝凿毛、清理、防水,钢筋绑扎,模板安装,混凝土浇筑,混凝土拆模、养护;中板、顶板结构施工;具体包括:模板支架搭设、施工缝处理,钢筋绑扎,堵头模板安装,混凝土浇筑,混凝土拆模、养护。本发明的方法施工简便,进展快,解决了现有地铁车站存在的施工缺陷、整体稳定性较差的技术问题,大大提高了施工质量、效率以及车站主体结构的整体强度和稳定性。
Construction method of station main body structure
The invention discloses a construction method of a station main body structure. The construction method comprises the following steps: constructing a structural bottom plate; the method specifically comprises the steps of base surface treatment, cushion layer and waterproof construction, steel bar binding, formwork installation, concrete pouring and concrete formwork removal and maintenance. Constructing a wall column structure; the construction method specifically comprises the steps of construction joint dabbing, cleaning, waterproofing, steel bar binding, formwork installation, concrete pouring, concrete formwork removal and maintenance. Constructing middle plate and top plate structures; the method specifically comprises the steps of formwork support erection, construction joint treatment, steel bar binding, plug formwork installation, concrete pouring, concrete formwork removal and maintenance. According to the method, construction is easy and convenient, the progress is fast, the technical problems that an existing subway station has construction defects and is poor in overall stability are solved, and the construction quality and efficiency and the overall strength and stability of a station main body structure are greatly improved.
本发明公开了一种车站主体结构的施工方法,包括以下步骤:结构底板施工;具体包括:基面处理,垫层及防水施工,钢筋绑扎,模板安装,混凝土浇筑,混凝土拆模和养护;墙柱结构施工;具体包括:施工缝凿毛、清理、防水,钢筋绑扎,模板安装,混凝土浇筑,混凝土拆模、养护;中板、顶板结构施工;具体包括:模板支架搭设、施工缝处理,钢筋绑扎,堵头模板安装,混凝土浇筑,混凝土拆模、养护。本发明的方法施工简便,进展快,解决了现有地铁车站存在的施工缺陷、整体稳定性较差的技术问题,大大提高了施工质量、效率以及车站主体结构的整体强度和稳定性。
Construction method of station main body structure
一种车站主体结构的施工方法
XIONG CHUNLE (author) / LI YINING (author) / GAO YANFENG (author) / SU SHUAI (author) / ZHU LIANGDONG (author)
2023-05-23
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Subway station construction main body enclosure structure
European Patent Office | 2023
|Subway station and accessory main body structure interface construction method
European Patent Office | 2023
|Auxiliary enclosure structure of parallel station main body and construction method
European Patent Office | 2020
|Subway station main body accessory connecting structure and waterproof construction method
European Patent Office | 2024
|