Auxiliary pile turning device for deepwater ultra-large steel pile
The invention discloses an auxiliary pile turning device for deepwater ultra-large steel piles, which comprises a hanging beam, an upper lifting lug and a lower lifting lug, the upper lifting lug is connected with the lifting hook through a lock; a first hook and a lowering baffle are arranged at the bottom end of the hanging beam; the first hook is connected with the lock pile rigging through the lock; the lock pile rigging is arranged in the middle of the steel pile; the tail hook is arranged at the top end of the steel pile end part; a lifting lug I is arranged at the top end of the tail hook; a second lifting lug is arranged at the end, away from the pile locking rigging, of the tail hook. A guide assembly is arranged at the bottom end of the tail hook; the second hook is connected with the first lifting lug through the lock, the lowering baffle is arranged on the inner side of the first hook, and the second hook is arranged at the side end of the lifting beam. The construction efficiency is greatly improved, the operation risk is reduced, and the construction cost is saved.
本发明公开了一种深水超大型钢桩辅助翻桩装置,包括:吊梁,所述吊梁顶端设置有上部吊耳;所述上部吊耳通过锁具与吊钩连接;所述吊梁底端设置有第一挂钩、下放挡板;所述第一挂钩通过所述锁具与锁桩索具连接;所述锁桩索具布置在钢桩中部;尾钩,所述尾钩布置在所述钢桩端部顶端;所述尾钩顶端设置有吊耳一;所述尾钩远离锁桩索具的一端设置有吊耳二;所述尾钩底端设置有导向组件;所述第二挂钩通过所述锁具与吊耳一连接,所述下放挡板设置于所述第一挂钩内侧,所述吊梁侧端设置有第二挂钩。本发明大大提高了施工效率,降低了作业风险,节约了施工费用。
Auxiliary pile turning device for deepwater ultra-large steel pile
The invention discloses an auxiliary pile turning device for deepwater ultra-large steel piles, which comprises a hanging beam, an upper lifting lug and a lower lifting lug, the upper lifting lug is connected with the lifting hook through a lock; a first hook and a lowering baffle are arranged at the bottom end of the hanging beam; the first hook is connected with the lock pile rigging through the lock; the lock pile rigging is arranged in the middle of the steel pile; the tail hook is arranged at the top end of the steel pile end part; a lifting lug I is arranged at the top end of the tail hook; a second lifting lug is arranged at the end, away from the pile locking rigging, of the tail hook. A guide assembly is arranged at the bottom end of the tail hook; the second hook is connected with the first lifting lug through the lock, the lowering baffle is arranged on the inner side of the first hook, and the second hook is arranged at the side end of the lifting beam. The construction efficiency is greatly improved, the operation risk is reduced, and the construction cost is saved.
本发明公开了一种深水超大型钢桩辅助翻桩装置,包括:吊梁,所述吊梁顶端设置有上部吊耳;所述上部吊耳通过锁具与吊钩连接;所述吊梁底端设置有第一挂钩、下放挡板;所述第一挂钩通过所述锁具与锁桩索具连接;所述锁桩索具布置在钢桩中部;尾钩,所述尾钩布置在所述钢桩端部顶端;所述尾钩顶端设置有吊耳一;所述尾钩远离锁桩索具的一端设置有吊耳二;所述尾钩底端设置有导向组件;所述第二挂钩通过所述锁具与吊耳一连接,所述下放挡板设置于所述第一挂钩内侧,所述吊梁侧端设置有第二挂钩。本发明大大提高了施工效率,降低了作业风险,节约了施工费用。
Auxiliary pile turning device for deepwater ultra-large steel pile
一种深水超大型钢桩辅助翻桩装置
CUI GUANGLIANG (author) / GAO SHUANG (author) / YANG LIANFENG (author) / WANG CHAO (author) / QIU WEI (author) / LI QIBAO (author) / HE CHEN (author) / HUANG SHANTIAN (author) / XU SHANZHI (author) / CHEN KAICHAO (author)
2023-05-26
Patent
Electronic Resource
Chinese
Double-ship pile turning method for deepwater ultra-large steel piles
European Patent Office | 2023
|Steel pipe pile deepwater guide hole pile sinking construction method
European Patent Office | 2023
|