Terrace structure and construction method thereof
The invention relates to a terrace structure, which is formed at the top of an underground bearing platform beam, and comprises a retaining wall formed at the top of the bearing platform beam in a pouring manner; the backfill layer is laid on the surface of the plain soil layer, and the top surface of the backfill layer is flush with the top surface of the retaining wall; the reinforcement cage is laid on the top of the backfill layer and the retaining wall; the concrete slab is formed on the top of the backfill layer in a pouring mode, and the reinforcement cage is embedded in the concrete slab. The problem that uneven settlement of the terrace is easily caused by a soft soil layer in a soil body is effectively solved, the terrace structure is improved to enable the concrete slab to be a whole and support the concrete slab, so that the risks of terrace cracking and uneven settlement are reduced, construction is convenient, the construction quality is improved, and the construction speed is increased.
本发明涉及一种地坪结构,地坪结构形成于地下承台梁的顶部,地坪结构包括:浇筑形成于承台梁的顶部的挡土墙;铺设于素土层表面的回填层,且回填层的顶面与挡土墙的顶面平齐;铺设于回填层和挡土墙的顶部的钢筋笼;以及浇筑形成于回填层的顶部的混凝土板,钢筋笼埋设于混凝土板内。本发明有效的解决了土体中的软弱土层容易导致地坪发生不均匀沉降的问题,通过改进地坪结构,以使得混凝土板为一个整体并支撑住混凝土板,从而减小地坪开裂和不均匀沉降的风险,且便于施工,提升了施工质量和施工速度。
Terrace structure and construction method thereof
The invention relates to a terrace structure, which is formed at the top of an underground bearing platform beam, and comprises a retaining wall formed at the top of the bearing platform beam in a pouring manner; the backfill layer is laid on the surface of the plain soil layer, and the top surface of the backfill layer is flush with the top surface of the retaining wall; the reinforcement cage is laid on the top of the backfill layer and the retaining wall; the concrete slab is formed on the top of the backfill layer in a pouring mode, and the reinforcement cage is embedded in the concrete slab. The problem that uneven settlement of the terrace is easily caused by a soft soil layer in a soil body is effectively solved, the terrace structure is improved to enable the concrete slab to be a whole and support the concrete slab, so that the risks of terrace cracking and uneven settlement are reduced, construction is convenient, the construction quality is improved, and the construction speed is increased.
本发明涉及一种地坪结构,地坪结构形成于地下承台梁的顶部,地坪结构包括:浇筑形成于承台梁的顶部的挡土墙;铺设于素土层表面的回填层,且回填层的顶面与挡土墙的顶面平齐;铺设于回填层和挡土墙的顶部的钢筋笼;以及浇筑形成于回填层的顶部的混凝土板,钢筋笼埋设于混凝土板内。本发明有效的解决了土体中的软弱土层容易导致地坪发生不均匀沉降的问题,通过改进地坪结构,以使得混凝土板为一个整体并支撑住混凝土板,从而减小地坪开裂和不均匀沉降的风险,且便于施工,提升了施工质量和施工速度。
Terrace structure and construction method thereof
地坪结构及其施工方法
HUANG KAI (author) / ZHANG ZHEN (author) / JI WEI (author) / LIN WENBIAO (author) / WEI XIANKAI (author) / YANG ZONG (author) / HUO ZERUI (author)
2023-05-26
Patent
Electronic Resource
Chinese
Terrace integrated structure and construction method thereof
European Patent Office | 2021
|Overhead terrace mounting structure and construction method thereof
European Patent Office | 2021
|Gravel terrace paving structure and construction method thereof
European Patent Office | 2024
|