Creeping formwork assembly and core tube synchronous construction method
The invention relates to a creeping formwork assembly and core tube synchronous construction method which comprises the following steps: binding a first section of core tube reinforcing steel bars, mounting a first creeping cone embedded part on the outer side of the first section of core tube reinforcing steel bars, and then closing a formwork to pour a first section of core tube; binding a second section of core tube reinforcing steel bar, installing second climbing cone embedded parts on the inner side and the outer side of the second section of core tube reinforcing steel bar, and hanging the outer wall climbing formwork lower frame body on the first climbing cone embedded part; closing the mold and pouring a second section of core tube; an outer wall creeping formwork upper frame body is fixed to the outer wall creeping formwork lower frame body to form an outer wall creeping formwork main frame body, then a third section of core tube steel bars are bound, and third creeping cone embedded parts are installed on the inner side and the outer side of the third section of core tube steel bars; enabling the outer wall creeping formwork main frame body to climb upwards until the outer wall creeping formwork lower frame body is hung on a second creeping cone embedded part on the outer side; closing the mold and pouring a third section of core tube; and the inner cylinder creeping formwork main frame body is hung on the second creeping cone embedded part on the inner side. The problems that creeping formwork installation and deployment difficulty is high and the installation period is long in a narrow construction site are solved.
本发明涉及一种爬模拼装与核心筒同步施工方法,包括步骤:绑扎第一段核心筒钢筋,并于其外侧安装第一道爬锥预埋件,然后合模浇筑第一段核心筒;绑扎第二段核心筒钢筋,并于其内外两侧安装第二道爬锥预埋件,将外墙爬模下架体挂设于该第一道爬锥预埋件上;合模浇筑第二段核心筒;将外墙爬模上架体固定在该外墙爬模下架体上并形成外墙爬模总架体,然后绑扎第三段核心筒钢筋,并于其内外两侧安装第三道爬锥预埋件;使该外墙爬模总架体向上爬升,直至将该外墙爬模下架体挂设于外侧的第二道爬锥预埋件上;合模浇筑第三段核心筒;将内筒爬模总架体挂设于内侧的第二道爬锥预埋件上。本发明解决了狭小施工场地爬模安装部署难度高、安装周期长的问题。
Creeping formwork assembly and core tube synchronous construction method
The invention relates to a creeping formwork assembly and core tube synchronous construction method which comprises the following steps: binding a first section of core tube reinforcing steel bars, mounting a first creeping cone embedded part on the outer side of the first section of core tube reinforcing steel bars, and then closing a formwork to pour a first section of core tube; binding a second section of core tube reinforcing steel bar, installing second climbing cone embedded parts on the inner side and the outer side of the second section of core tube reinforcing steel bar, and hanging the outer wall climbing formwork lower frame body on the first climbing cone embedded part; closing the mold and pouring a second section of core tube; an outer wall creeping formwork upper frame body is fixed to the outer wall creeping formwork lower frame body to form an outer wall creeping formwork main frame body, then a third section of core tube steel bars are bound, and third creeping cone embedded parts are installed on the inner side and the outer side of the third section of core tube steel bars; enabling the outer wall creeping formwork main frame body to climb upwards until the outer wall creeping formwork lower frame body is hung on a second creeping cone embedded part on the outer side; closing the mold and pouring a third section of core tube; and the inner cylinder creeping formwork main frame body is hung on the second creeping cone embedded part on the inner side. The problems that creeping formwork installation and deployment difficulty is high and the installation period is long in a narrow construction site are solved.
本发明涉及一种爬模拼装与核心筒同步施工方法,包括步骤:绑扎第一段核心筒钢筋,并于其外侧安装第一道爬锥预埋件,然后合模浇筑第一段核心筒;绑扎第二段核心筒钢筋,并于其内外两侧安装第二道爬锥预埋件,将外墙爬模下架体挂设于该第一道爬锥预埋件上;合模浇筑第二段核心筒;将外墙爬模上架体固定在该外墙爬模下架体上并形成外墙爬模总架体,然后绑扎第三段核心筒钢筋,并于其内外两侧安装第三道爬锥预埋件;使该外墙爬模总架体向上爬升,直至将该外墙爬模下架体挂设于外侧的第二道爬锥预埋件上;合模浇筑第三段核心筒;将内筒爬模总架体挂设于内侧的第二道爬锥预埋件上。本发明解决了狭小施工场地爬模安装部署难度高、安装周期长的问题。
Creeping formwork assembly and core tube synchronous construction method
爬模拼装与核心筒同步施工方法
YANG XUYU (author) / ZITT (author) / WANG XUYI (author) / LIN XIAOHUA (author) / MA XINXI (author) / HAO LIMING (author) / AI QIYANG (author) / LI SHUN (author) / ZHANG YONG (author) / ZHANG WEI (author)
2023-05-26
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|European Patent Office | 2023
|Solar cell creeping formwork guardrail and creeping formwork
European Patent Office | 2023
|Super high-rise building core tube breaststroke creeping formwork device
European Patent Office | 2015
|