A platform for research: civil engineering, architecture and urbanism
Core tube creeping formwork construction shear wall reinforcing structure and construction method thereof
The invention provides a core tube creeping formwork construction shear wall reinforcing structure and a reinforcing construction method thereof, and belongs to the field of creeping formwork construction. According to the technical scheme, the reinforcing structure comprises a reinforcing assembly arranged between core tube shear walls, the reinforcing assembly comprises wall body embedded parts arranged in the shear walls, T-shaped connecting parts are arranged on the side faces of the wall body embedded parts, and reinforcing beams are arranged between the opposite T-shaped connecting parts. The method has the advantages that the H-shaped steel beams are used for enhancing the overall rigidity of a small-section core tube shear wall body in core tube creeping formwork construction, the creeping formwork attachment stress requirement is met, on the basis that the core tube construction method is not changed and an original creeping formwork construction system is kept, smooth construction of a core tube is guaranteed with the lowest cost, and the construction efficiency is greatly improved.
本发明提供了一种核心筒爬模施工剪力墙加固结构及其加固施工方法,属于爬模施工领域领域。其技术方案为:包括设置在核心筒剪力墙之间的加固组件,加固组件包括设置在剪力墙中的墙体预埋件,墙体预埋件侧面设置有T形连接件,相对T形连接件之间设置有加固梁。本发明的有益效果为:利用H型钢梁增强核心筒爬模施工中小截面核心筒剪力墙墙体整体刚度,满足爬模附着受力要求,在不改变核心筒施工方法保持原有爬模施工体系的基础上,以最低成本,保证了核心筒的顺利施工,大大提升了施工效率。
Core tube creeping formwork construction shear wall reinforcing structure and construction method thereof
The invention provides a core tube creeping formwork construction shear wall reinforcing structure and a reinforcing construction method thereof, and belongs to the field of creeping formwork construction. According to the technical scheme, the reinforcing structure comprises a reinforcing assembly arranged between core tube shear walls, the reinforcing assembly comprises wall body embedded parts arranged in the shear walls, T-shaped connecting parts are arranged on the side faces of the wall body embedded parts, and reinforcing beams are arranged between the opposite T-shaped connecting parts. The method has the advantages that the H-shaped steel beams are used for enhancing the overall rigidity of a small-section core tube shear wall body in core tube creeping formwork construction, the creeping formwork attachment stress requirement is met, on the basis that the core tube construction method is not changed and an original creeping formwork construction system is kept, smooth construction of a core tube is guaranteed with the lowest cost, and the construction efficiency is greatly improved.
本发明提供了一种核心筒爬模施工剪力墙加固结构及其加固施工方法,属于爬模施工领域领域。其技术方案为:包括设置在核心筒剪力墙之间的加固组件,加固组件包括设置在剪力墙中的墙体预埋件,墙体预埋件侧面设置有T形连接件,相对T形连接件之间设置有加固梁。本发明的有益效果为:利用H型钢梁增强核心筒爬模施工中小截面核心筒剪力墙墙体整体刚度,满足爬模附着受力要求,在不改变核心筒施工方法保持原有爬模施工体系的基础上,以最低成本,保证了核心筒的顺利施工,大大提升了施工效率。
Core tube creeping formwork construction shear wall reinforcing structure and construction method thereof
一种核心筒爬模施工剪力墙加固结构及其施工方法
WANG JINGWEN (author) / GAO JIGUI (author) / ZHAO XIAOJUAN (author) / WANG FEI (author) / LIU TENG (author) / LIU YUNCHENG (author) / LI ZHISHUI (author) / WANG PENGCHONG (author) / JIAO SICHENG (author) / WANG YAKUN (author)
2023-03-24
Patent
Electronic Resource
Chinese
Creeping formwork assembly and core tube synchronous construction method
European Patent Office | 2023
|Staircase shear wall formwork reinforcing construction method
European Patent Office | 2022
|European Patent Office | 2023
|Creeping formwork structure and construction method thereof
European Patent Office | 2021
|