A platform for research: civil engineering, architecture and urbanism
Support construction method of frame structure building
The invention relates to the field of fabricated building construction, and discloses a support construction method of a frame structure building, which comprises the following steps: pre-burying connecting structures on prefabricated upright posts, fixing the prefabricated upright posts on the construction ground, then connecting an inclined support at the pre-buried connecting mechanism of each prefabricated upright post, connecting the tops of a plurality of inclined supports to a horizontal support plate, and fixing the horizontal support plate to the prefabricated upright posts; the horizontal supporting plate is located in the center of the bottom of a construction layer room. Prefabricated superposed beams are installed between the top ends of the prefabricated stand columns, and the ends of the two ends of the horizontal supporting plate are erected on the prefabricated superposed beams. The problems that the overall construction period of construction is long, the occupancy rate of the construction operation space below the horizontal component is large, other construction operations are affected, and certain safety risks and operation inconvenience exist due to the fact that the horizontal component adopts a lower supporting mode in the construction process of a frame structure building with a small space can be solved.
本发明涉及装配式建筑施工领域,公开了一种框架结构建筑的支撑施工方法,在预制立柱上预埋连接结构,将预制立柱固定在施工地面,然后在每个预制立柱的预埋连接机构处均连接斜支撑,多个斜支撑顶部连接在一块水平支撑板上,水平支撑板位于施工层房间底部中心部位;在预制立柱顶端之间安装有预制叠合梁,水平支撑板两端的端头搭设在预制叠合梁上。本发明可解决开间较小的框架结构建筑施工过程中水平构件采用下方支撑方式,施工的整体工期长,对水平构件下方的施工作业空间占用率大,影响其他施工操作,存在一定的安全风险和操作不便性的问题。
Support construction method of frame structure building
The invention relates to the field of fabricated building construction, and discloses a support construction method of a frame structure building, which comprises the following steps: pre-burying connecting structures on prefabricated upright posts, fixing the prefabricated upright posts on the construction ground, then connecting an inclined support at the pre-buried connecting mechanism of each prefabricated upright post, connecting the tops of a plurality of inclined supports to a horizontal support plate, and fixing the horizontal support plate to the prefabricated upright posts; the horizontal supporting plate is located in the center of the bottom of a construction layer room. Prefabricated superposed beams are installed between the top ends of the prefabricated stand columns, and the ends of the two ends of the horizontal supporting plate are erected on the prefabricated superposed beams. The problems that the overall construction period of construction is long, the occupancy rate of the construction operation space below the horizontal component is large, other construction operations are affected, and certain safety risks and operation inconvenience exist due to the fact that the horizontal component adopts a lower supporting mode in the construction process of a frame structure building with a small space can be solved.
本发明涉及装配式建筑施工领域,公开了一种框架结构建筑的支撑施工方法,在预制立柱上预埋连接结构,将预制立柱固定在施工地面,然后在每个预制立柱的预埋连接机构处均连接斜支撑,多个斜支撑顶部连接在一块水平支撑板上,水平支撑板位于施工层房间底部中心部位;在预制立柱顶端之间安装有预制叠合梁,水平支撑板两端的端头搭设在预制叠合梁上。本发明可解决开间较小的框架结构建筑施工过程中水平构件采用下方支撑方式,施工的整体工期长,对水平构件下方的施工作业空间占用率大,影响其他施工操作,存在一定的安全风险和操作不便性的问题。
Support construction method of frame structure building
一种框架结构建筑的支撑施工方法
ZHOU WEI (author) / GUO YANBIN (author) / LIU CHUNLEI (author) / YANG QI (author) / LI JIANCHAO (author) / ZHANG ZHEN (author)
2023-05-26
Patent
Electronic Resource
Chinese
BUILDING FRAME, BUILDING FRAME STRUCTURE, BUILDING PANEL STRUCTURE, BUILDING CONSTRUCTION METHOD
European Patent Office | 2019
|Support frame with protective structure for building construction
European Patent Office | 2024
|Support frame integrated construction method for dismantling and newly building building structure
European Patent Office | 2024
|