A platform for research: civil engineering, architecture and urbanism
Foundation pit concrete pouring equipment and method
The invention relates to foundation pit concrete pouring equipment and method. The equipment comprises a first-stage chute and a second-stage chute which are communicated end to end; the first-stage chute comprises a height-adjustable and position-adjustable feeding hopper and a first-stage conveying pipeline communicated with the lower end of the feeding hopper; the second-stage chute comprises a transfer platform and a second-stage conveying pipeline, wherein the transfer platform is communicated with the lower end of the first-stage conveying pipeline, the height and position of the transfer platform can be adjusted, and the second-stage conveying pipeline is communicated with the lower end of the transfer platform and can rotate horizontally. The slump requirement is lowered, the hydration heat of concrete is effectively reduced, the concrete pouring efficiency is improved, the construction technical requirement is lowered, the problem that a large number of chutes and tumbling barrels cannot be built due to the narrow construction site at present is solved, the construction cost is saved, and standardized construction is facilitated.
本发明涉及一种基坑混凝土浇筑设备及方法,该设备包括首尾连通的一级溜槽和二级溜槽;所述一级溜槽包括可调整高度和位置的进料斗和与所述进料斗下端连通的一级输送管道;所述二级溜槽包括与所述一级输送管道下端连通且可调整高度和位置的中转平台和与所述中转平台下端连通且可水平转动的二级输送管道。本发明降低了坍落度要求,有效减少混凝土的水化热,提高了混凝土的浇筑效率,降低了施工技术要求,解决了目前施工场地狭小无法实现搭建大量溜槽及串筒的难题,节约施工成本,便于标准化施工。
Foundation pit concrete pouring equipment and method
The invention relates to foundation pit concrete pouring equipment and method. The equipment comprises a first-stage chute and a second-stage chute which are communicated end to end; the first-stage chute comprises a height-adjustable and position-adjustable feeding hopper and a first-stage conveying pipeline communicated with the lower end of the feeding hopper; the second-stage chute comprises a transfer platform and a second-stage conveying pipeline, wherein the transfer platform is communicated with the lower end of the first-stage conveying pipeline, the height and position of the transfer platform can be adjusted, and the second-stage conveying pipeline is communicated with the lower end of the transfer platform and can rotate horizontally. The slump requirement is lowered, the hydration heat of concrete is effectively reduced, the concrete pouring efficiency is improved, the construction technical requirement is lowered, the problem that a large number of chutes and tumbling barrels cannot be built due to the narrow construction site at present is solved, the construction cost is saved, and standardized construction is facilitated.
本发明涉及一种基坑混凝土浇筑设备及方法,该设备包括首尾连通的一级溜槽和二级溜槽;所述一级溜槽包括可调整高度和位置的进料斗和与所述进料斗下端连通的一级输送管道;所述二级溜槽包括与所述一级输送管道下端连通且可调整高度和位置的中转平台和与所述中转平台下端连通且可水平转动的二级输送管道。本发明降低了坍落度要求,有效减少混凝土的水化热,提高了混凝土的浇筑效率,降低了施工技术要求,解决了目前施工场地狭小无法实现搭建大量溜槽及串筒的难题,节约施工成本,便于标准化施工。
Foundation pit concrete pouring equipment and method
一种基坑混凝土浇筑设备及方法
WEN GUOWEI (author) / REN KUN (author) / ZHU YUQING (author) / XIE JIANJUN (author) / RAO HUAN (author) / ZHANG JINZE (author) / GU DONGQING (author) / WU HUAILIN (author) / CAO XIAO (author) / TIAN JINSONG (author)
2023-05-30
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Concrete pouring equipment for foundation pile construction
European Patent Office | 2024
|Concrete pouring device and raft foundation pouring method
European Patent Office | 2021
|Bridge pile foundation concrete pouring equipment and method
European Patent Office | 2024
|Foundation concrete pouring equipment for building construction
European Patent Office | 2023
|