A platform for research: civil engineering, architecture and urbanism
Equipment foundation concrete pouring device
The invention provides an equipment foundation concrete pouring device, and relates to the technical field of building construction pouring formworks. The anti-inclination frame is provided with a jacking assembly for jacking the formwork, and the jacking assembly is used for applying a reverse acting force to the formwork, so that the situation that the formwork is extruded by concrete to move towards the side close to the anti-inclination frame, so that the formwork inclines and deflects, and the stability of the formwork is poor is avoided; and a downward pressing assembly which is in linkage with the jacking assembly to prevent the formwork from floating upwards is arranged on the formwork and can apply downward pressing force to the formwork in the vertical direction, so that no gap exists between the formwork and the engineering foundation base face, and the pouring quality of the equipment during foundation pouring is improved.
本发明提出了一种设备基础混凝土浇筑装置,涉及建筑施工浇筑模板技术领域。防倾架上设有顶持模板的顶持组件,用于对模板施加一个反向作用力,避免模板受到混凝土的挤压向靠近防倾架的一侧运动致使模板发生倾斜、偏斜,造成模板的稳定性较差;模板上设有与顶持组件联动防止模板上浮的下压组件可以对模板沿竖直方向施加一个下压力,使得模板与工程基础基面不出现缝隙,提高本设备对基础浇筑时的浇筑质量。
Equipment foundation concrete pouring device
The invention provides an equipment foundation concrete pouring device, and relates to the technical field of building construction pouring formworks. The anti-inclination frame is provided with a jacking assembly for jacking the formwork, and the jacking assembly is used for applying a reverse acting force to the formwork, so that the situation that the formwork is extruded by concrete to move towards the side close to the anti-inclination frame, so that the formwork inclines and deflects, and the stability of the formwork is poor is avoided; and a downward pressing assembly which is in linkage with the jacking assembly to prevent the formwork from floating upwards is arranged on the formwork and can apply downward pressing force to the formwork in the vertical direction, so that no gap exists between the formwork and the engineering foundation base face, and the pouring quality of the equipment during foundation pouring is improved.
本发明提出了一种设备基础混凝土浇筑装置,涉及建筑施工浇筑模板技术领域。防倾架上设有顶持模板的顶持组件,用于对模板施加一个反向作用力,避免模板受到混凝土的挤压向靠近防倾架的一侧运动致使模板发生倾斜、偏斜,造成模板的稳定性较差;模板上设有与顶持组件联动防止模板上浮的下压组件可以对模板沿竖直方向施加一个下压力,使得模板与工程基础基面不出现缝隙,提高本设备对基础浇筑时的浇筑质量。
Equipment foundation concrete pouring device
一种设备基础混凝土浇筑装置
SHI ZHUOZHUO (author) / WANG BO (author) / LI SIYU (author) / DONG WENLI (author) / ZHANG ZHANG (author) / ZHANG SIMING (author) / GAO YUNFEI (author)
2024-09-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Concrete pouring device and raft foundation pouring method
European Patent Office | 2021
|Concrete pouring equipment for foundation pile construction
European Patent Office | 2024
|Foundation concrete pouring equipment for building construction
European Patent Office | 2023
|