Fixed formwork gutter structure based on shell structure and construction method of fixed formwork gutter structure
The fixed formwork gutter structure comprises a cross beam parallel to a main structure floor support plate, the end, in the length direction, of the cross beam is fixedly connected to a low-span structure shell beam, and the end, away from the low-span structure shell beam, of the cross beam in the length direction is fixedly connected with a connecting plate; the end, away from the cross beam, of the connecting plate is fixedly connected with a shell beam of the high-span structure, a plurality of longitudinal beams are fixedly installed on the cross beam in the mode of being perpendicular to the cross beam, the longitudinal beams are arranged in the through length direction of the concrete gutter at equal intervals, and the concrete gutter is fixedly installed on the side, away from the cross beam, of the longitudinal beams. By means of the construction method, the problems that due to construction in a traditional mode, gaps are formed in procedure connection, workers are idled, mechanical equipment materials are idle and the like are effectively solved, the construction efficiency is greatly improved, the cost expenditure is reduced, the danger in the construction process is reduced, and the construction efficiency is improved. And the popularization value is high.
本发明公开了一种基于甲壳结构的固定式支模天沟结构及其施工方法,包括平行于主体结构楼承板设置的横梁,横梁沿长度方向的一端固定连接于低跨结构甲壳梁,横梁沿长度方向远离低跨结构甲壳梁的一端固定连接有连接板,连接板垂直于横梁且远离横梁的一端与高跨结构甲壳梁固定连接,横梁上垂直于横梁固定安装有多个纵梁,且多个纵梁等间距地设于沿混凝土天沟的通长方向,混凝土天沟固定安装在纵梁远离横梁的一侧,且横梁上在远离纵梁的一侧的表面铺设有脚手板,本发明有效解决了传统方式施工带来的工序衔接出现空档,导致工人窝工及机械设备材料闲置等情况,大大提高了施工效率、减少了成本费用支出、降低了施工过程的危险性,具有较高的推广价值。
Fixed formwork gutter structure based on shell structure and construction method of fixed formwork gutter structure
The fixed formwork gutter structure comprises a cross beam parallel to a main structure floor support plate, the end, in the length direction, of the cross beam is fixedly connected to a low-span structure shell beam, and the end, away from the low-span structure shell beam, of the cross beam in the length direction is fixedly connected with a connecting plate; the end, away from the cross beam, of the connecting plate is fixedly connected with a shell beam of the high-span structure, a plurality of longitudinal beams are fixedly installed on the cross beam in the mode of being perpendicular to the cross beam, the longitudinal beams are arranged in the through length direction of the concrete gutter at equal intervals, and the concrete gutter is fixedly installed on the side, away from the cross beam, of the longitudinal beams. By means of the construction method, the problems that due to construction in a traditional mode, gaps are formed in procedure connection, workers are idled, mechanical equipment materials are idle and the like are effectively solved, the construction efficiency is greatly improved, the cost expenditure is reduced, the danger in the construction process is reduced, and the construction efficiency is improved. And the popularization value is high.
本发明公开了一种基于甲壳结构的固定式支模天沟结构及其施工方法,包括平行于主体结构楼承板设置的横梁,横梁沿长度方向的一端固定连接于低跨结构甲壳梁,横梁沿长度方向远离低跨结构甲壳梁的一端固定连接有连接板,连接板垂直于横梁且远离横梁的一端与高跨结构甲壳梁固定连接,横梁上垂直于横梁固定安装有多个纵梁,且多个纵梁等间距地设于沿混凝土天沟的通长方向,混凝土天沟固定安装在纵梁远离横梁的一侧,且横梁上在远离纵梁的一侧的表面铺设有脚手板,本发明有效解决了传统方式施工带来的工序衔接出现空档,导致工人窝工及机械设备材料闲置等情况,大大提高了施工效率、减少了成本费用支出、降低了施工过程的危险性,具有较高的推广价值。
Fixed formwork gutter structure based on shell structure and construction method of fixed formwork gutter structure
基于甲壳结构的固定式支模天沟结构及其施工方法
SHI HONGLIANG (author) / ZHAN YONGFANG (author) / MA MENG (author) / XU ZESEN (author) / QIU JIN (author) / YU FENGFENG (author) / XU RONG (author) / JI JINXING (author) / ZHANG CHENG (author) / ZHANG RUI (author)
2023-05-30
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Supporting structure for granary concrete gutter formwork erecting and construction method thereof
European Patent Office | 2021
|GUTTER MOUNTING MEMBER, GUTTER STRUCTURE, AND CONSTRUCTION METHOD FOR GUTTER STRUCTURE
European Patent Office | 2024
|Formwork-free integrated rapid construction method for gutter parapet wall
European Patent Office | 2024
|Formwork-erecting-free system construction method for irregular concrete gutter
European Patent Office | 2021
|Novel formwork erecting method for gutter in pitched roof house
European Patent Office | 2022
|