A platform for research: civil engineering, architecture and urbanism
Splicing mechanism for erecting steel box girder
The splicing mechanism for erecting the steel box girder comprises a base, a guide shaft is fixedly arranged at the top of the base, a limiting plate is fixed to the top end of the guide shaft, a moving seat is slidably arranged on the outer surface of the guide shaft, and a lifting assembly for driving the moving seat to ascend and descend is arranged in the base. Clamping seats are symmetrically arranged at the bottom of the moving seat in a sliding mode, moving assemblies for driving the clamping seats to horizontally move are symmetrically arranged in the clamping seats, supporting assemblies are symmetrically arranged between the guide shafts and the moving seats, and clamping assemblies for clamping the steel box girder are arranged in the clamping seats; the problems that in the prior art, due to the fact that the degree of freedom of position adjustment of a splicing device on the steel box girder is small, the position of the steel box girder cannot be corrected, the steel box girder is prone to deviation in the installation process, the splicing precision is low, and the construction quality is poor are solved.
本发明涉及一种钢箱梁架设用拼接机构,包括底座,底座的顶部固定设置有导向轴,导向轴的顶端固定有限位板,导向轴的外表面滑动设置有移动座,所述底座的内部设置有驱动移动座升降的升降组件,移动座的底部对称且滑动设置有夹持座,夹持座的内部设置有,移动座的内部对称设置有带动夹持座水平移动的移动组件,导向轴与移动座之间对称设置有支撑组件,夹持座的内部设置有对钢箱梁进行夹持的夹持组件;解决了现有技术中的拼接装置对钢箱梁的位置调节自由度较少,从而无法对钢箱梁的位置进行纠偏,导致钢箱梁安装过程中容易发生偏移,造成拼接精度低,施工质量差等问题。
Splicing mechanism for erecting steel box girder
The splicing mechanism for erecting the steel box girder comprises a base, a guide shaft is fixedly arranged at the top of the base, a limiting plate is fixed to the top end of the guide shaft, a moving seat is slidably arranged on the outer surface of the guide shaft, and a lifting assembly for driving the moving seat to ascend and descend is arranged in the base. Clamping seats are symmetrically arranged at the bottom of the moving seat in a sliding mode, moving assemblies for driving the clamping seats to horizontally move are symmetrically arranged in the clamping seats, supporting assemblies are symmetrically arranged between the guide shafts and the moving seats, and clamping assemblies for clamping the steel box girder are arranged in the clamping seats; the problems that in the prior art, due to the fact that the degree of freedom of position adjustment of a splicing device on the steel box girder is small, the position of the steel box girder cannot be corrected, the steel box girder is prone to deviation in the installation process, the splicing precision is low, and the construction quality is poor are solved.
本发明涉及一种钢箱梁架设用拼接机构,包括底座,底座的顶部固定设置有导向轴,导向轴的顶端固定有限位板,导向轴的外表面滑动设置有移动座,所述底座的内部设置有驱动移动座升降的升降组件,移动座的底部对称且滑动设置有夹持座,夹持座的内部设置有,移动座的内部对称设置有带动夹持座水平移动的移动组件,导向轴与移动座之间对称设置有支撑组件,夹持座的内部设置有对钢箱梁进行夹持的夹持组件;解决了现有技术中的拼接装置对钢箱梁的位置调节自由度较少,从而无法对钢箱梁的位置进行纠偏,导致钢箱梁安装过程中容易发生偏移,造成拼接精度低,施工质量差等问题。
Splicing mechanism for erecting steel box girder
一种钢箱梁架设用拼接机构
WU XING (author) / WANG JINNIU (author) / LIU HAO (author) / CAI XIAOGANG (author) / LI WEICHAO (author) / HUANG-CHEN XINRAN (author)
2023-06-06
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Girder transporting and erecting equipment and construction method for erecting box girder
European Patent Office | 2020
|