The invention relates to a laminated slab construction technology of an assembly type steel structure house, and belongs to the field of laminated slab construction technologies. The method comprises the following steps that S1, steel columns are installed, self-compacting concrete is poured into the steel columns, and horizontal H-shaped steel beams are installed on the steel columns; s2, the laminated slab is hoisted and placed and installed on the horizontal H-shaped steel beam; s3, according to the design size of the gap between the steel column and the laminated slab, a matched steel formwork is machined; s4, a formwork moving mechanism is installed on the steel column, and the steel formwork is installed on the formwork moving mechanism, so that the steel formwork is right opposite to the gap; and S5, the steel formwork is driven by a formwork moving mechanism to move upwards along the steel column till the steel formwork is attached to the laminated slab. The construction method has the effect of improving the construction efficiency.
本申请涉及一种装配式钢结构住宅的叠合板施工工艺,属于叠合板施工技术的领域。其包括以下步骤:S1:安装钢柱,在钢柱内浇筑自密实混凝土,在钢柱上安装水平H型钢梁;S2:吊装叠合板并放置安装于水平H型钢梁上;S3:根据钢柱与叠合板之间缝隙的设计尺寸,加工相适配的钢模板;S4:将模板移动机构安装至钢柱上,将钢模板安装至模板移动机构上,使得钢模板与缝隙相正对;S5:通过模板移动机构驱动钢模板沿钢柱向上移动,至钢模板与叠合板贴合。本申请具有提升施工效率的效果。
Laminated slab construction process of fabricated steel structure house
The invention relates to a laminated slab construction technology of an assembly type steel structure house, and belongs to the field of laminated slab construction technologies. The method comprises the following steps that S1, steel columns are installed, self-compacting concrete is poured into the steel columns, and horizontal H-shaped steel beams are installed on the steel columns; s2, the laminated slab is hoisted and placed and installed on the horizontal H-shaped steel beam; s3, according to the design size of the gap between the steel column and the laminated slab, a matched steel formwork is machined; s4, a formwork moving mechanism is installed on the steel column, and the steel formwork is installed on the formwork moving mechanism, so that the steel formwork is right opposite to the gap; and S5, the steel formwork is driven by a formwork moving mechanism to move upwards along the steel column till the steel formwork is attached to the laminated slab. The construction method has the effect of improving the construction efficiency.
本申请涉及一种装配式钢结构住宅的叠合板施工工艺,属于叠合板施工技术的领域。其包括以下步骤:S1:安装钢柱,在钢柱内浇筑自密实混凝土,在钢柱上安装水平H型钢梁;S2:吊装叠合板并放置安装于水平H型钢梁上;S3:根据钢柱与叠合板之间缝隙的设计尺寸,加工相适配的钢模板;S4:将模板移动机构安装至钢柱上,将钢模板安装至模板移动机构上,使得钢模板与缝隙相正对;S5:通过模板移动机构驱动钢模板沿钢柱向上移动,至钢模板与叠合板贴合。本申请具有提升施工效率的效果。
Laminated slab construction process of fabricated steel structure house
装配式钢结构住宅的叠合板施工工艺
QIN BINBIN (author) / KIM YONG (author) / LIN NAN (author) / YU JIASHENG (author) / ZHANG LIANG (author) / WANG JIAN (author) / LIU XUBO (author) / WU HAIWEI (author) / LIU YAJING (author) / YANG XINGHE (author)
2023-06-23
Patent
Electronic Resource
Chinese
Fabricated steel structure concrete wall and laminated slab system construction method
European Patent Office | 2023
|Fabricated laminated slab wall structure and construction method
European Patent Office | 2023
|Construction method of fabricated building laminated slab
European Patent Office | 2023
|