A platform for research: civil engineering, architecture and urbanism
New building outer wall construction device
The new building outer wall construction device comprises a carrier assembly, a climbing halfpace, a lifting assembly, a supporting assembly, an auxiliary assembly, a blocking rod assembly and a door plate assembly, and the climbing halfpace is connected with the outer walls of the two sides of the carrier assembly; the lifting assembly is connected with the inner wall of the upper side of the carrier assembly, and the supporting assembly is connected with the outer wall of the upper side of the lifting assembly. The auxiliary assembly comprises a first extrusion assembly and a second extrusion assembly, the first extrusion assembly comprises a first adjusting push rod, a first supporting sliding rail, a first sliding groove, a first extrusion plate and a first rubber mat, the second extrusion assembly comprises a second adjusting push rod, a supporting base table, an air spring, a second extrusion plate and a second rubber mat, and the door plate assembly is connected with the inner side wall of the baffle assembly. Therefore, through the first extrusion assembly and the second extrusion assembly of the auxiliary assembly, according to the solidification degree of the exterior wall tiles, auxiliary supporting work of the exterior wall tiles is conducted, meanwhile, supporting of the device is conducted, the application range of the device is widened, and convenience of the device is improved.
本申请公开了一种新建筑外墙施工装置,包括:载体组件、攀爬梯台、举升组件、支撑组件、辅助组件、档杆组件和门板组件,攀爬梯台与载体组件的两侧外壁相连;举升组件与载体组件的上侧内壁相连,支撑组件与举升组件的上侧外壁相连;辅助组件包括:第一挤压组件和第二挤压组件,第一挤压组件包括:第一调节推杆、第一支撑滑轨、第一滑槽、第一挤压板和第一胶垫,第二挤压组件包括:第二调节推杆、支撑基台、气弹簧、第二挤压板和第二胶垫,门板组件与挡板组件的内侧壁相连。由此,能够通过辅助组件的第一挤压组件和第二挤压组件,根据外墙砖的凝固程度,进行外墙砖辅助支撑的工作,同时进行该装置的支撑,提升了该装置的适用范围和便捷性。
New building outer wall construction device
The new building outer wall construction device comprises a carrier assembly, a climbing halfpace, a lifting assembly, a supporting assembly, an auxiliary assembly, a blocking rod assembly and a door plate assembly, and the climbing halfpace is connected with the outer walls of the two sides of the carrier assembly; the lifting assembly is connected with the inner wall of the upper side of the carrier assembly, and the supporting assembly is connected with the outer wall of the upper side of the lifting assembly. The auxiliary assembly comprises a first extrusion assembly and a second extrusion assembly, the first extrusion assembly comprises a first adjusting push rod, a first supporting sliding rail, a first sliding groove, a first extrusion plate and a first rubber mat, the second extrusion assembly comprises a second adjusting push rod, a supporting base table, an air spring, a second extrusion plate and a second rubber mat, and the door plate assembly is connected with the inner side wall of the baffle assembly. Therefore, through the first extrusion assembly and the second extrusion assembly of the auxiliary assembly, according to the solidification degree of the exterior wall tiles, auxiliary supporting work of the exterior wall tiles is conducted, meanwhile, supporting of the device is conducted, the application range of the device is widened, and convenience of the device is improved.
本申请公开了一种新建筑外墙施工装置,包括:载体组件、攀爬梯台、举升组件、支撑组件、辅助组件、档杆组件和门板组件,攀爬梯台与载体组件的两侧外壁相连;举升组件与载体组件的上侧内壁相连,支撑组件与举升组件的上侧外壁相连;辅助组件包括:第一挤压组件和第二挤压组件,第一挤压组件包括:第一调节推杆、第一支撑滑轨、第一滑槽、第一挤压板和第一胶垫,第二挤压组件包括:第二调节推杆、支撑基台、气弹簧、第二挤压板和第二胶垫,门板组件与挡板组件的内侧壁相连。由此,能够通过辅助组件的第一挤压组件和第二挤压组件,根据外墙砖的凝固程度,进行外墙砖辅助支撑的工作,同时进行该装置的支撑,提升了该装置的适用范围和便捷性。
New building outer wall construction device
一种新建筑外墙施工装置
DAI YANG (author) / HUI LIN (author) / GENG HUI (author) / XU YA (author) / CHANG YIYANG (author) / NI KUI (author) / YANG HU (author) / LIU PENG (author) / SUN NANNAN (author) / LI YANG (author)
2023-06-23
Patent
Electronic Resource
Chinese
Adjustable building outer wall manned construction device
European Patent Office | 2021
|