A platform for research: civil engineering, architecture and urbanism
Installation and construction process of external wall insulation board
The invention provides a mounting construction process of an external wall insulation board, and relates to the field of building construction. Comprising the following steps: cutting an external wall insulation integrated plate into a first plate according to parting design requirements, and forming a plurality of strip-shaped deep grooves in the first plate; and after the first plate is fixed to the wall surface, strip-shaped connecting pieces are installed in the strip-shaped deep grooves, and anchoring pieces are implanted along the strip-shaped connecting pieces at intervals to be anchored to the wall surface. The outer wall thermal insulation integrated board is cut into one piece instead of multiple pieces, the slotting anchoring mode is adopted to achieve the design parting requirement and effect, the outer wall thermal insulation integrated board can be directly connected with the integrated body in an anchoring mode, and compared with a traditional technology, the cutting frequency and the installation frequency can be reduced, and the construction efficiency is improved; and in addition, through the integrated anchoring mode, the construction quality can be enhanced, the risk that the integrated plate falls off is reduced, and the flatness is improved.
本发明提供一种外墙保温板的安装施工工艺,涉及建筑施工领域。包括依据分缝设计要求将外墙保温一体板切割为第一板块,并在第一板块上开设多个条状深槽;将第一板块固定于墙面后,在条状深槽内安装条状连接件,沿条状连接件间隔植入锚固件与墙面锚固。通过将外墙保温一体板由切割为多块变为切割为一块,采用开槽锚固的方式达到设计分缝要求和效果,且能够直接与一体锚固连接,与传统工艺比较可以减少切割次数和安装次数,增加施工效率,并且通过这种一体锚固的方式可以加强施工质量,一体板脱落的风险降低,平整度增加。
Installation and construction process of external wall insulation board
The invention provides a mounting construction process of an external wall insulation board, and relates to the field of building construction. Comprising the following steps: cutting an external wall insulation integrated plate into a first plate according to parting design requirements, and forming a plurality of strip-shaped deep grooves in the first plate; and after the first plate is fixed to the wall surface, strip-shaped connecting pieces are installed in the strip-shaped deep grooves, and anchoring pieces are implanted along the strip-shaped connecting pieces at intervals to be anchored to the wall surface. The outer wall thermal insulation integrated board is cut into one piece instead of multiple pieces, the slotting anchoring mode is adopted to achieve the design parting requirement and effect, the outer wall thermal insulation integrated board can be directly connected with the integrated body in an anchoring mode, and compared with a traditional technology, the cutting frequency and the installation frequency can be reduced, and the construction efficiency is improved; and in addition, through the integrated anchoring mode, the construction quality can be enhanced, the risk that the integrated plate falls off is reduced, and the flatness is improved.
本发明提供一种外墙保温板的安装施工工艺,涉及建筑施工领域。包括依据分缝设计要求将外墙保温一体板切割为第一板块,并在第一板块上开设多个条状深槽;将第一板块固定于墙面后,在条状深槽内安装条状连接件,沿条状连接件间隔植入锚固件与墙面锚固。通过将外墙保温一体板由切割为多块变为切割为一块,采用开槽锚固的方式达到设计分缝要求和效果,且能够直接与一体锚固连接,与传统工艺比较可以减少切割次数和安装次数,增加施工效率,并且通过这种一体锚固的方式可以加强施工质量,一体板脱落的风险降低,平整度增加。
Installation and construction process of external wall insulation board
一种外墙保温板的安装施工工艺
LIANG ZHANSHENG (author) / HE JUN (author) / JI CHONGYAO (author) / WANG JUNBING (author) / MA LIMIN (author) / WU YUNFEI (author) / WANG ERDONG (author) / TIAN LINLIN (author) / GAO HUI (author)
2023-06-23
Patent
Electronic Resource
Chinese
Installation construction method of external wall insulation board
European Patent Office | 2021
|Building external wall insulation board installation construction method
European Patent Office | 2021
|Composite board outer wall external thermal insulation construction process
European Patent Office | 2022
|Installation method of external wall heat insulation integrated board
European Patent Office | 2024
|Installation method of external wall heat insulation integrated board
European Patent Office | 2023
|