A platform for research: civil engineering, architecture and urbanism
Concrete pouring formwork for construction of pushing type steel plate composite beam bridge
The invention discloses a concrete pouring template for construction of a pushing type steel plate composite girder bridge in the technical field of girder bridge construction, which comprises a template I, a template II is arranged at the upper end of the template I, the template II is positioned on the upper end surface of the template I, and a limiting hole is formed between the template I and the template II; a connecting mechanism is arranged between the exteriors of the template I and the template II, and a defoaming mechanism is arranged on the lower end surface of the template I; the bubble removing mechanism comprises two fixing plates, balls, a bottom frame, a connecting pad, a vibration motor and a driving mechanism, the two fixing plates are fixedly connected to the two sides of the lower end face of the first template respectively, the balls are slidably embedded in the lower ends of the interiors of the fixing plates, the bottom frame is arranged outside the fixing plates, and the fixing plates and the bottom frame are connected through the connecting pad. And staged treatment can greatly improve the concrete pouring efficiency, meanwhile, the pouring quality is guaranteed, and the concrete pouring device is practical.
本发明公开了梁桥建设技术领域的一种顶推式钢板组合梁桥建设用混凝土浇筑模板,包括模板一,模板一的上端设置与模板二,模板二位于模板一的上端面,模板一和模板二之间开设有限定孔,模板一和模板二的外部之间的位置设置有连接机构,模板一的下端面设置有去泡机构;去泡机构包括有固定板、滚珠、底框、连接垫、振动电机与驱动机构,固定板的数量为两个,且其分别固定连接在模板一的下端面两侧位置,滚珠滑动嵌在固定板的内部下端位置,底框设置在固定板的外部,固定板与底框之间通过连接垫连接,分阶段处理能够大大提高对混凝土浇筑的效率,同时也保证其浇筑的质量,较为实用。
Concrete pouring formwork for construction of pushing type steel plate composite beam bridge
The invention discloses a concrete pouring template for construction of a pushing type steel plate composite girder bridge in the technical field of girder bridge construction, which comprises a template I, a template II is arranged at the upper end of the template I, the template II is positioned on the upper end surface of the template I, and a limiting hole is formed between the template I and the template II; a connecting mechanism is arranged between the exteriors of the template I and the template II, and a defoaming mechanism is arranged on the lower end surface of the template I; the bubble removing mechanism comprises two fixing plates, balls, a bottom frame, a connecting pad, a vibration motor and a driving mechanism, the two fixing plates are fixedly connected to the two sides of the lower end face of the first template respectively, the balls are slidably embedded in the lower ends of the interiors of the fixing plates, the bottom frame is arranged outside the fixing plates, and the fixing plates and the bottom frame are connected through the connecting pad. And staged treatment can greatly improve the concrete pouring efficiency, meanwhile, the pouring quality is guaranteed, and the concrete pouring device is practical.
本发明公开了梁桥建设技术领域的一种顶推式钢板组合梁桥建设用混凝土浇筑模板,包括模板一,模板一的上端设置与模板二,模板二位于模板一的上端面,模板一和模板二之间开设有限定孔,模板一和模板二的外部之间的位置设置有连接机构,模板一的下端面设置有去泡机构;去泡机构包括有固定板、滚珠、底框、连接垫、振动电机与驱动机构,固定板的数量为两个,且其分别固定连接在模板一的下端面两侧位置,滚珠滑动嵌在固定板的内部下端位置,底框设置在固定板的外部,固定板与底框之间通过连接垫连接,分阶段处理能够大大提高对混凝土浇筑的效率,同时也保证其浇筑的质量,较为实用。
Concrete pouring formwork for construction of pushing type steel plate composite beam bridge
一种顶推式钢板组合梁桥建设用混凝土浇筑模板
QIU CHAO (author) / YI JIANBO (author) / LI XIN (author) / ZHOU MINGCHAO (author) / WU SHU (author) / ZHANG JIMEI (author) / TONG YANCHUAN (author) / LI HONG (author) / LIN YUMING (author) / LONG TANGQIONG (author)
2023-06-27
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2024
|European Patent Office | 2022
|European Patent Office | 2024
|Road and bridge construction cement concrete whole piece type pouring steel formwork
European Patent Office | 2021
|Formwork and construction method for concrete pouring of concrete slab-steel truss composite beam
European Patent Office | 2024
|