The invention discloses an elevator foundation pit well construction method, which relates to the field of building construction, and comprises the following steps: measuring the position of a setting-out building foundation pit; a building foundation pit is excavated; measuring a pay-off elevator foundation pit well; excavating an elevator foundation pit well; binding an elevator foundation pit well cushion layer and reinforcing steel bars; elevator foundation pit well concrete pouring; binding construction of a building foundation pit cushion layer, waterproof coiled materials and reinforcing steel bars; and building foundation pit bottom plate concrete pouring construction and the like. According to the construction method, local dewatering is adopted for the elevator foundation pit well in consideration of the cost and the overall structure, so that the construction workload is reduced, the construction cost is reduced, and the construction time is saved; and meanwhile, according to the construction method, the elevator foundation pit well and foundation construction are connected into a whole, the joint treatment process is reduced, the integrity and waterproofness are guaranteed, and therefore the foundation construction quality is improved.
本发明公开了一种电梯基坑井施工方法,涉及建筑施工领域,包括步骤有:测量放线建筑基坑位置;建筑基坑开挖;测量放线电梯基坑井;电梯基坑井开挖;电梯基坑井垫层、钢筋绑扎;电梯基坑井混凝土浇筑;建筑基坑垫层、防水卷材、钢筋绑扎施工;建筑基坑底板混凝土浇筑施工等。该施工方法考虑到成本和整体结构性对电梯基坑井采用局部降水,以此来减少施工的工作量,减少施工的成本和节省施工的时间;同时该施工方法将电梯基坑井与基础施工连接成整体,减少了接缝处理流程,保证了整体性和防水性,从而提高了基础施工的质量。
Elevator foundation pit well construction method
The invention discloses an elevator foundation pit well construction method, which relates to the field of building construction, and comprises the following steps: measuring the position of a setting-out building foundation pit; a building foundation pit is excavated; measuring a pay-off elevator foundation pit well; excavating an elevator foundation pit well; binding an elevator foundation pit well cushion layer and reinforcing steel bars; elevator foundation pit well concrete pouring; binding construction of a building foundation pit cushion layer, waterproof coiled materials and reinforcing steel bars; and building foundation pit bottom plate concrete pouring construction and the like. According to the construction method, local dewatering is adopted for the elevator foundation pit well in consideration of the cost and the overall structure, so that the construction workload is reduced, the construction cost is reduced, and the construction time is saved; and meanwhile, according to the construction method, the elevator foundation pit well and foundation construction are connected into a whole, the joint treatment process is reduced, the integrity and waterproofness are guaranteed, and therefore the foundation construction quality is improved.
本发明公开了一种电梯基坑井施工方法,涉及建筑施工领域,包括步骤有:测量放线建筑基坑位置;建筑基坑开挖;测量放线电梯基坑井;电梯基坑井开挖;电梯基坑井垫层、钢筋绑扎;电梯基坑井混凝土浇筑;建筑基坑垫层、防水卷材、钢筋绑扎施工;建筑基坑底板混凝土浇筑施工等。该施工方法考虑到成本和整体结构性对电梯基坑井采用局部降水,以此来减少施工的工作量,减少施工的成本和节省施工的时间;同时该施工方法将电梯基坑井与基础施工连接成整体,减少了接缝处理流程,保证了整体性和防水性,从而提高了基础施工的质量。
Elevator foundation pit well construction method
一种电梯基坑井施工方法
ZHANG SHENG (author) / WANG BAOLIANG (author) / CHEN LONGGANG (author) / HUANG ZHE (author) / MA XUAN (author) / ZHAO KUI (author) / LIN DINGJIANG (author) / LIU HONGBIN (author) / TIAN DONGDONG (author) / WANG YANGZHI (author)
2023-07-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Single-foundation construction elevator foundation and construction method
European Patent Office | 2024
|Elevator foundation pit structure and elevator foundation pit construction method
European Patent Office | 2024
|Fabricated construction elevator foundation and construction method
European Patent Office | 2020
|