A platform for research: civil engineering, architecture and urbanism
Construction method of waterproof structure for joint of prefabricated comprehensive pipe gallery
The invention relates to pipe gallery construction, in particular to a construction method of a waterproof structure for the joint of a prefabricated comprehensive pipe gallery. Comprising the following steps that S1, a sealing reinforcing piece is manufactured, and the sealing reinforcing piece comprises an upper C-shaped plate, a lower C-shaped plate, a left vertical plate and a right vertical plate; s2, a first groove and a second groove are formed in the inner wall of the socket end and the inner wall of the inserting end of the two sections of pipe galleries in socket connection correspondingly; s3, a sealing ring is installed in the first groove of the bell end of the pipe gallery; s4, the sealing reinforcers are assembled into a whole, and the sealing reinforcers are placed in the first grooves; and S5, a sealing ring is installed in the second groove of the inserting end of the pipe gallery, the inserting end of the pipe gallery is inserted into the socket end, and the outer end of the sealing reinforcing piece is arranged in the second groove of the inserting end. The sealing reinforcer intercepts and blocks the side-lying type Z-shaped butt joint face in the pipe gallery, surface water is prevented from permeating and dripping into the pipe gallery, the sealing effect is improved, and the safety of various pipelines in the pipe gallery is guaranteed.
本发明涉及管廊施工,特别是一种预制综合管廊连接处用防水结构施工方法。包括如下步骤:S1、制作密封加强件,密封加强件包括上C形板、下C形板、左竖板和右竖板;S2、在两节承插连接的管廊的承口端和插接端的内壁分别开设第一凹槽和第二凹槽;S3、在管廊的承口端的第一凹槽内安装密封圈;S4、密封加强件组装为整体,将密封加强件置于第一凹槽内;S5、在管廊的插接端的第二凹槽内安装密封圈,将管廊的插接端插装到承口端,密封加强件的外端置于插接端的第二凹槽内。本发明的密封加强件对管廊中侧躺型Z字对接面进行拦截封堵,防止地表水渗透滴落进管廊中,提高密封效果,保证管廊内各种管线的安全。
Construction method of waterproof structure for joint of prefabricated comprehensive pipe gallery
The invention relates to pipe gallery construction, in particular to a construction method of a waterproof structure for the joint of a prefabricated comprehensive pipe gallery. Comprising the following steps that S1, a sealing reinforcing piece is manufactured, and the sealing reinforcing piece comprises an upper C-shaped plate, a lower C-shaped plate, a left vertical plate and a right vertical plate; s2, a first groove and a second groove are formed in the inner wall of the socket end and the inner wall of the inserting end of the two sections of pipe galleries in socket connection correspondingly; s3, a sealing ring is installed in the first groove of the bell end of the pipe gallery; s4, the sealing reinforcers are assembled into a whole, and the sealing reinforcers are placed in the first grooves; and S5, a sealing ring is installed in the second groove of the inserting end of the pipe gallery, the inserting end of the pipe gallery is inserted into the socket end, and the outer end of the sealing reinforcing piece is arranged in the second groove of the inserting end. The sealing reinforcer intercepts and blocks the side-lying type Z-shaped butt joint face in the pipe gallery, surface water is prevented from permeating and dripping into the pipe gallery, the sealing effect is improved, and the safety of various pipelines in the pipe gallery is guaranteed.
本发明涉及管廊施工,特别是一种预制综合管廊连接处用防水结构施工方法。包括如下步骤:S1、制作密封加强件,密封加强件包括上C形板、下C形板、左竖板和右竖板;S2、在两节承插连接的管廊的承口端和插接端的内壁分别开设第一凹槽和第二凹槽;S3、在管廊的承口端的第一凹槽内安装密封圈;S4、密封加强件组装为整体,将密封加强件置于第一凹槽内;S5、在管廊的插接端的第二凹槽内安装密封圈,将管廊的插接端插装到承口端,密封加强件的外端置于插接端的第二凹槽内。本发明的密封加强件对管廊中侧躺型Z字对接面进行拦截封堵,防止地表水渗透滴落进管廊中,提高密封效果,保证管廊内各种管线的安全。
Construction method of waterproof structure for joint of prefabricated comprehensive pipe gallery
预制综合管廊连接处用防水结构施工方法
ZHANG HAIFENG (author) / LI BO (author) / WANG JUNYONG (author) / BAO HAIBO (author)
2023-07-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated comprehensive pipe gallery joint waterproof connecting structure
European Patent Office | 2020
|Comprehensive waterproof construction method for underground prefabricated pipe gallery
European Patent Office | 2022
|Underground waterproof fast-splicing prefabricated comprehensive pipe gallery
European Patent Office | 2020
|European Patent Office | 2020
|European Patent Office | 2020
|