Construction method for reserving local trestle for ground construction
The invention relates to a construction method for reserving a local trestle for overground construction, a trestle is arranged above a basement structure, the trestle comprises a first part right facing an upper structure and a second part different from the first part, and the construction method comprises the following steps that the first part is dismantled, and the second part is reserved; a hole is formed in the second part; constructing an upper structure on the basement structure by using the second part, firstly constructing a structural column of the upper structure, and enabling the structural column to penetrate through the hole; and after construction of the upper structure is completed, the trestle corresponding to the second part is dismantled. The technical problem that in the prior art, ground structure construction cannot be conducted through an underground structure site is solved. The second part can be used for placing construction machinery, the problem that parts such as basement ramps, holes and stairs cannot be used for standing hoisting of the truck crane is solved, the construction progress of an overground main body structure can be effectively guaranteed, and extra construction measures do not need to be taken.
本发明涉及一种保留局部栈桥用于地上施工的施工方法,在地下室结构上方设置有栈桥,栈桥包括正对于上部结构的第一部分以及区别于该第一部分的第二部分,包括如下步骤:将第一部分拆除,保留第二部分;于该第二部分上开设洞口;于地下室结构上利用第二部分施工上部结构,先施工上部结构的结构柱,并使结构柱穿过所述洞口;在上部结构施工完毕后,拆除第二部分所对应的栈桥。本申请解决了现有技术中地上结构施工不能够利用地下结构场地进行施工的技术问题。本申请的第二部分能够用于施工机械的放置,解决了地下室坡道、洞口、楼梯等部位无法用于汽车吊站位吊装的难题,能够有效的保证地上主体结构的施工进度且无需采取额外的施工措施。
Construction method for reserving local trestle for ground construction
The invention relates to a construction method for reserving a local trestle for overground construction, a trestle is arranged above a basement structure, the trestle comprises a first part right facing an upper structure and a second part different from the first part, and the construction method comprises the following steps that the first part is dismantled, and the second part is reserved; a hole is formed in the second part; constructing an upper structure on the basement structure by using the second part, firstly constructing a structural column of the upper structure, and enabling the structural column to penetrate through the hole; and after construction of the upper structure is completed, the trestle corresponding to the second part is dismantled. The technical problem that in the prior art, ground structure construction cannot be conducted through an underground structure site is solved. The second part can be used for placing construction machinery, the problem that parts such as basement ramps, holes and stairs cannot be used for standing hoisting of the truck crane is solved, the construction progress of an overground main body structure can be effectively guaranteed, and extra construction measures do not need to be taken.
本发明涉及一种保留局部栈桥用于地上施工的施工方法,在地下室结构上方设置有栈桥,栈桥包括正对于上部结构的第一部分以及区别于该第一部分的第二部分,包括如下步骤:将第一部分拆除,保留第二部分;于该第二部分上开设洞口;于地下室结构上利用第二部分施工上部结构,先施工上部结构的结构柱,并使结构柱穿过所述洞口;在上部结构施工完毕后,拆除第二部分所对应的栈桥。本申请解决了现有技术中地上结构施工不能够利用地下结构场地进行施工的技术问题。本申请的第二部分能够用于施工机械的放置,解决了地下室坡道、洞口、楼梯等部位无法用于汽车吊站位吊装的难题,能够有效的保证地上主体结构的施工进度且无需采取额外的施工措施。
Construction method for reserving local trestle for ground construction
保留局部栈桥用于地上施工的施工方法
ZHANG NAN (author) / PAN WENQIANG (author) / ZHANG ZHENGHONG (author) / JI RONGSHENG (author) / XUE CHUNDAN (author) / YAN WENMING (author) / LIN WENBIAO (author) / HUO ZERUI (author)
2023-07-04
Patent
Electronic Resource
Chinese