A platform for research: civil engineering, architecture and urbanism
Construction method for effective connection of steel plate shear wall tie bars
The invention relates to the field of building construction, and particularly discloses a construction method for effective connection of steel plate shear wall tie bars, which comprises the steps of preparing steel plates, lug plates, horizontal steel bars, longitudinal load-bearing steel bars, distribution bars and tie bars; prefabricating tie bars and a prefabricated reinforcement cage; mounting a first layer of horizontal steel bars, a first layer of longitudinal load-bearing steel bars, a second layer of horizontal steel bars, a second longitudinal load-bearing steel bar, a third layer of horizontal steel bars, a third layer of longitudinal load-bearing steel bars and a fourth layer of horizontal steel bars; and a tie bar mounting step. According to the scheme, the lug plates and the first layer of horizontal steel bars can be machined and installed in a steel structure factory, the follow-up installation period on a construction site is greatly shortened, manpower and material resources are saved, and economic benefits are good.
本发明涉及建筑施工领域,具体公开了一种钢板剪力墙拉筋有效连接的构造方法,包括钢板、耳板、水平钢筋、纵向受力钢筋、分布筋和拉筋准备步骤;拉筋和预制钢筋骨架的预制步骤;第一层水平钢筋、第一层纵向受力钢筋、第二层水平钢筋、第二纵向受力钢筋、第三层水平钢筋、第三层纵向受力钢筋和第四层水平钢筋的安装步骤;拉筋安装步骤。本方案中耳板和第一层水平钢筋均可在钢结构工厂完成加工和安装,大大缩短了后续在施工现场的安装工期,节约了人力物力,经济效益良好。
Construction method for effective connection of steel plate shear wall tie bars
The invention relates to the field of building construction, and particularly discloses a construction method for effective connection of steel plate shear wall tie bars, which comprises the steps of preparing steel plates, lug plates, horizontal steel bars, longitudinal load-bearing steel bars, distribution bars and tie bars; prefabricating tie bars and a prefabricated reinforcement cage; mounting a first layer of horizontal steel bars, a first layer of longitudinal load-bearing steel bars, a second layer of horizontal steel bars, a second longitudinal load-bearing steel bar, a third layer of horizontal steel bars, a third layer of longitudinal load-bearing steel bars and a fourth layer of horizontal steel bars; and a tie bar mounting step. According to the scheme, the lug plates and the first layer of horizontal steel bars can be machined and installed in a steel structure factory, the follow-up installation period on a construction site is greatly shortened, manpower and material resources are saved, and economic benefits are good.
本发明涉及建筑施工领域,具体公开了一种钢板剪力墙拉筋有效连接的构造方法,包括钢板、耳板、水平钢筋、纵向受力钢筋、分布筋和拉筋准备步骤;拉筋和预制钢筋骨架的预制步骤;第一层水平钢筋、第一层纵向受力钢筋、第二层水平钢筋、第二纵向受力钢筋、第三层水平钢筋、第三层纵向受力钢筋和第四层水平钢筋的安装步骤;拉筋安装步骤。本方案中耳板和第一层水平钢筋均可在钢结构工厂完成加工和安装,大大缩短了后续在施工现场的安装工期,节约了人力物力,经济效益良好。
Construction method for effective connection of steel plate shear wall tie bars
一种钢板剪力墙拉筋有效连接的构造方法
FAN YUANYE (author) / SHEN YU (author) / TANG WEIYAO (author) / MAO ZHENNAN (author) / YE RONGHAO (author) / ZHANG CONGPENG (author) / WANG JUNJUN (author) / HU ZEKUN (author) / LUO YUANWEI (author) / HE LIANG (author)
2023-07-14
Patent
Electronic Resource
Chinese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Combined steel plate concrete shear wall with built-in prestressed steel bars
European Patent Office | 2020
|Foundation connection construction process for perforated steel plate combined superposed shear wall
European Patent Office | 2020
|