A platform for research: civil engineering, architecture and urbanism
Method for connecting new roadbed and old roadbed of concrete pavement
The invention discloses a method for connecting a new roadbed and an old roadbed of a concrete pavement, the method is matched with a cutting device, the cutting device comprises a rack, a first supporting leg, a second supporting leg, a longitudinal cutting assembly, a transverse cutting assembly, a cutting chain, a first motor and a second motor, and the first supporting leg, the second supporting leg, the longitudinal cutting assembly, the transverse cutting assembly and the cutting chain are movably mounted on the rack. According to the connecting method for the new roadbed and the old roadbed of the concrete pavement, when the lengths of the first supporting leg and the second supporting leg are adjusted, the longitudinal cutting assembly and the transverse cutting assembly are driven to move, so that the cutting depth of the longitudinal cutting assembly is changed, the cutting width of the transverse cutting assembly is changed, and the state is adjusted to adapt to a plain soil layer with the thickness; the plain soil slope is cut into a reasonable step shape, so that the subsequent plain soil layer connection work can be carried out; in the working process, the plain soil slope can be cut only by pushing the machine frame to move along the guide rails, then the cut soil is removed, the plain soil slope can be in a step shape, and operation is easy and fast.
本发明公开了一种混凝土路面的新旧路基的连接方法,其与一种切割装置配合,该切割装置包括机架以及活动安装于机架上第一支腿、第二支腿、纵向切割组件、横向切割组件、切割链以及第一电机和第二电机。该发明提供的混凝土路面的新旧路基的连接方法,在调整第一支腿和第二支腿的长度时,会带动纵向切割组件和横向切割组件移动,以使纵向切割组件的切割深度改变、横向切割组件的切割宽度改变,并调整成适应该厚度素土层的状态,以便将该素土斜坡切割成合理的阶梯状,以便进行后续素土层连接的工作;在工作时,只需要推着机架沿着导轨移动即可切割素土斜坡,然后再把分割出来的泥土除去即可使素土斜坡呈现阶梯状,操作简单快捷。
Method for connecting new roadbed and old roadbed of concrete pavement
The invention discloses a method for connecting a new roadbed and an old roadbed of a concrete pavement, the method is matched with a cutting device, the cutting device comprises a rack, a first supporting leg, a second supporting leg, a longitudinal cutting assembly, a transverse cutting assembly, a cutting chain, a first motor and a second motor, and the first supporting leg, the second supporting leg, the longitudinal cutting assembly, the transverse cutting assembly and the cutting chain are movably mounted on the rack. According to the connecting method for the new roadbed and the old roadbed of the concrete pavement, when the lengths of the first supporting leg and the second supporting leg are adjusted, the longitudinal cutting assembly and the transverse cutting assembly are driven to move, so that the cutting depth of the longitudinal cutting assembly is changed, the cutting width of the transverse cutting assembly is changed, and the state is adjusted to adapt to a plain soil layer with the thickness; the plain soil slope is cut into a reasonable step shape, so that the subsequent plain soil layer connection work can be carried out; in the working process, the plain soil slope can be cut only by pushing the machine frame to move along the guide rails, then the cut soil is removed, the plain soil slope can be in a step shape, and operation is easy and fast.
本发明公开了一种混凝土路面的新旧路基的连接方法,其与一种切割装置配合,该切割装置包括机架以及活动安装于机架上第一支腿、第二支腿、纵向切割组件、横向切割组件、切割链以及第一电机和第二电机。该发明提供的混凝土路面的新旧路基的连接方法,在调整第一支腿和第二支腿的长度时,会带动纵向切割组件和横向切割组件移动,以使纵向切割组件的切割深度改变、横向切割组件的切割宽度改变,并调整成适应该厚度素土层的状态,以便将该素土斜坡切割成合理的阶梯状,以便进行后续素土层连接的工作;在工作时,只需要推着机架沿着导轨移动即可切割素土斜坡,然后再把分割出来的泥土除去即可使素土斜坡呈现阶梯状,操作简单快捷。
Method for connecting new roadbed and old roadbed of concrete pavement
一种混凝土路面的新旧路基的连接方法
LI YI (author) / LIU DASHUANG (author) / DU ZHENHUA (author) / QIN ZHIQIANG (author) / ZHANG YONGBIN (author)
2023-07-18
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
ROADBED CONSTRUCTION METHOD, ROADBED, AND ARTIFICIAL TURF PAVEMENT
European Patent Office | 2021
|Roadbed and pavement splicing structure for roadbed engineering
European Patent Office | 2024
|Reinforced foam concrete roadbed structure and roadbed filling method
European Patent Office | 2021
|