Concrete pouring method for underwater pile hole
The concrete pouring method for the underwater pile hole comprises the following steps that a guide pipe and a storage hopper are connected, and the communication position of the guide pipe and the storage hopper is temporarily blocked; the target use amount of the concrete is obtained, and the storage hopper is filled with the concrete according to the target use amount of the concrete; the guide pipe is inserted into the underwater pile hole, so that the guide pipe is communicated with the underwater pile hole; and the storage hopper and the guide pipe are communicated, and the underwater pile hole is poured. The underwater pile hole is poured by temporarily blocking the communication position of the guide pipe and the storage hopper, inserting the guide pipe into the underwater pile hole and then communicating the storage hopper and the guide pipe, in the concrete pouring process, the fluidity of concrete in the storage hopper is guaranteed, when the concrete enters the guide pipe from the storage hopper, contact between the concrete and water is reduced, and the concrete pouring efficiency is improved. Therefore, the pouring quality of underwater concrete is guaranteed, and the construction quality and the construction efficiency of underwater pile holes are improved.
本发明公开了一种用于水下桩孔的混凝土灌注方法,包括如下步骤:连接导管与储料斗,并临时堵塞所述导管与所述储料斗的连通处;获取所述混凝土的目标用量,并根据所述混凝土的目标用量向所述储料斗中充入所述混凝土;向所述水下桩孔中插入所述导管,以使所述导管与所述水下桩孔连通;连通所述储料斗和所述导管,对所述水下桩孔进行灌注。本发明通过临时堵塞导管与储料斗的连通处,在向水下桩孔中插入导管后,再连通储料斗和导管,对水下桩孔进行灌注,在混凝土的灌注过程中,保证了储料斗中混凝土的流动性,且在混凝土从储料斗进入导管时,减少了混凝土和水的接触,以保证水下混凝土的灌注质量,提高了水下桩孔的施工质量和施工效率。
Concrete pouring method for underwater pile hole
The concrete pouring method for the underwater pile hole comprises the following steps that a guide pipe and a storage hopper are connected, and the communication position of the guide pipe and the storage hopper is temporarily blocked; the target use amount of the concrete is obtained, and the storage hopper is filled with the concrete according to the target use amount of the concrete; the guide pipe is inserted into the underwater pile hole, so that the guide pipe is communicated with the underwater pile hole; and the storage hopper and the guide pipe are communicated, and the underwater pile hole is poured. The underwater pile hole is poured by temporarily blocking the communication position of the guide pipe and the storage hopper, inserting the guide pipe into the underwater pile hole and then communicating the storage hopper and the guide pipe, in the concrete pouring process, the fluidity of concrete in the storage hopper is guaranteed, when the concrete enters the guide pipe from the storage hopper, contact between the concrete and water is reduced, and the concrete pouring efficiency is improved. Therefore, the pouring quality of underwater concrete is guaranteed, and the construction quality and the construction efficiency of underwater pile holes are improved.
本发明公开了一种用于水下桩孔的混凝土灌注方法,包括如下步骤:连接导管与储料斗,并临时堵塞所述导管与所述储料斗的连通处;获取所述混凝土的目标用量,并根据所述混凝土的目标用量向所述储料斗中充入所述混凝土;向所述水下桩孔中插入所述导管,以使所述导管与所述水下桩孔连通;连通所述储料斗和所述导管,对所述水下桩孔进行灌注。本发明通过临时堵塞导管与储料斗的连通处,在向水下桩孔中插入导管后,再连通储料斗和导管,对水下桩孔进行灌注,在混凝土的灌注过程中,保证了储料斗中混凝土的流动性,且在混凝土从储料斗进入导管时,减少了混凝土和水的接触,以保证水下混凝土的灌注质量,提高了水下桩孔的施工质量和施工效率。
Concrete pouring method for underwater pile hole
用于水下桩孔的混凝土灌注方法
LIANG JIANXIN (author) / XIE XIN (author) / SONG PENGJIE (author) / ZHOU HUBING (author) / LV YONGJUN (author) / HU LIZHENG (author) / YU XIANGTAO (author) / YUAN YUE (author) / JIA YINGGANG (author) / XIE XIONG (author)
2023-07-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underwater pile foundation concrete pouring mold and concrete underwater pouring method thereof
European Patent Office | 2021
|Underwater manual hole digging pile concrete pouring device for railway
European Patent Office | 2024
|Underwater concrete pouring device and underwater concrete pouring method
European Patent Office | 2024
|Underwater concrete pouring method for cast-in-place pile
European Patent Office | 2023
|Underwater concrete pouring method for cast-in-place pile
European Patent Office | 2021
|