A platform for research: civil engineering, architecture and urbanism
Wellhead protection device of inspection well and construction method
The invention discloses an inspection well mouth protection device and a construction method.The protection device comprises a first anchor plate, a second anchor plate, a first shielding plate, a second shielding plate, a third shielding plate, a fourth shielding plate, a fifth shielding plate and a sixth shielding plate, and the first shielding plate, the second shielding plate, the third shielding plate, the fourth shielding plate, the fifth shielding plate and the sixth shielding plate are all fan-shaped; the first shielding plate, the second shielding plate, the third shielding plate, the fourth shielding plate, the fifth shielding plate and the sixth shielding plate can be combined into a circle covering the inspection well, the first anchor plate and the second anchor plate are arranged at the 12 o'clock position and the 6 o'clock position of the well wall of the inspection well, and the first shielding plate and the fourth shielding plate are connected to the first anchor plate and the second anchor plate in a foldable mode respectively. The second shielding plate and the third shielding plate are respectively connected with the left side and the right side of the first shielding plate in a foldable manner; the fifth shielding plate and the sixth shielding plate are respectively connected with the left side and the right side of the fourth shielding plate in a foldable manner; the inspection well mouth protection device and the construction method are good in safety and high in practicability.
本发明公开了一种检查井井口防护装置及施工方法,防护装置,包括第一锚板、第二锚板、第一遮板、第二遮板、第三遮板、第四遮板、第五遮板、第六遮板,第一遮板、第二遮板、第三遮板、第四遮板、第五遮板、第六遮板均为扇形,且第一遮板、第二遮板、第三遮板、第四遮板、第五遮板、第六遮板可组合成覆盖于检查井的圆形,第一锚板和第二锚板设置于检查井的井墙的12点和6点钟位置,第一遮板和第四遮板分别可折叠连接于第一锚板和第二锚板,第二遮板和第三遮板分别可折叠连接第一遮板的左右两侧,第五遮板和第六遮板分别可折叠连接第四遮板的左右两侧;本发明提供了一种安全性好、实用性强的检查井井口防护装置及施工方法。
Wellhead protection device of inspection well and construction method
The invention discloses an inspection well mouth protection device and a construction method.The protection device comprises a first anchor plate, a second anchor plate, a first shielding plate, a second shielding plate, a third shielding plate, a fourth shielding plate, a fifth shielding plate and a sixth shielding plate, and the first shielding plate, the second shielding plate, the third shielding plate, the fourth shielding plate, the fifth shielding plate and the sixth shielding plate are all fan-shaped; the first shielding plate, the second shielding plate, the third shielding plate, the fourth shielding plate, the fifth shielding plate and the sixth shielding plate can be combined into a circle covering the inspection well, the first anchor plate and the second anchor plate are arranged at the 12 o'clock position and the 6 o'clock position of the well wall of the inspection well, and the first shielding plate and the fourth shielding plate are connected to the first anchor plate and the second anchor plate in a foldable mode respectively. The second shielding plate and the third shielding plate are respectively connected with the left side and the right side of the first shielding plate in a foldable manner; the fifth shielding plate and the sixth shielding plate are respectively connected with the left side and the right side of the fourth shielding plate in a foldable manner; the inspection well mouth protection device and the construction method are good in safety and high in practicability.
本发明公开了一种检查井井口防护装置及施工方法,防护装置,包括第一锚板、第二锚板、第一遮板、第二遮板、第三遮板、第四遮板、第五遮板、第六遮板,第一遮板、第二遮板、第三遮板、第四遮板、第五遮板、第六遮板均为扇形,且第一遮板、第二遮板、第三遮板、第四遮板、第五遮板、第六遮板可组合成覆盖于检查井的圆形,第一锚板和第二锚板设置于检查井的井墙的12点和6点钟位置,第一遮板和第四遮板分别可折叠连接于第一锚板和第二锚板,第二遮板和第三遮板分别可折叠连接第一遮板的左右两侧,第五遮板和第六遮板分别可折叠连接第四遮板的左右两侧;本发明提供了一种安全性好、实用性强的检查井井口防护装置及施工方法。
Wellhead protection device of inspection well and construction method
一种检查井井口防护装置及施工方法
CHEN YUEPING (author) / LU YONGXIANG (author)
2023-07-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Elevator wellhead safety protection device for constructional engineering construction
European Patent Office | 2021
|European Patent Office | 2022
|