A platform for research: civil engineering, architecture and urbanism
Building construction tamping device
The invention belongs to the technical field of building construction, and provides a building construction tamping device which comprises a frame, wheels are arranged at the bottom of the frame, and a traction rod is fixedly connected to one end of the frame; the soil layer gravel screening-out unit is arranged on the side, close to the traction rod, of the vehicle frame, the soil layer gravel screening-out unit and the ground surface soil layer are correspondingly arranged, and the soil layer gravel screening-out unit is used for screening out large-particle gravel on the surface of the soil layer before the soil layer is compacted; the tamping unit is arranged on the side, away from the traction rod, of the vehicle frame, and the tamping unit corresponds to the ground and is used for conducting tamping operation on the ground; and the height adjusting part is arranged between the tamping unit and the frame, and the height adjusting part is used for keeping the tamping unit and the ground in a contact state all the time when the tamping unit works. According to the device, sundries such as broken stones on the surface layer of the ground can be cleaned before the ground is tamped, and meanwhile, in the tamping process, a large amount of dust can be avoided.
本发明属于建筑施工技术领域,提供一种建筑施工夯实装置,包括车架,车架的底部设置有车轮,车架的一端固定连接有牵引杆;土层碎石筛出单元,土层碎石筛出单元设置在车架上靠近牵引杆的一侧,土层碎石筛出单元与地表土层对应设置,土层碎石筛出单元用于在夯实土层前对土层表面的大颗粒碎石进行筛出;夯实单元,夯实单元设置在车架上远离牵引杆的一侧,夯实单元与地面对应设置,用于对地面进行夯实作业;高度调节部,高度调节部设置在夯实单元与车架之间,高度调节部用于在夯实单元作业时保持夯实单元与地面始终为接触状态。本发明可以在夯实地面前对地面表层的碎石等杂物进行清理,同时在夯实过程中,可以避免大量灰尘出现。
Building construction tamping device
The invention belongs to the technical field of building construction, and provides a building construction tamping device which comprises a frame, wheels are arranged at the bottom of the frame, and a traction rod is fixedly connected to one end of the frame; the soil layer gravel screening-out unit is arranged on the side, close to the traction rod, of the vehicle frame, the soil layer gravel screening-out unit and the ground surface soil layer are correspondingly arranged, and the soil layer gravel screening-out unit is used for screening out large-particle gravel on the surface of the soil layer before the soil layer is compacted; the tamping unit is arranged on the side, away from the traction rod, of the vehicle frame, and the tamping unit corresponds to the ground and is used for conducting tamping operation on the ground; and the height adjusting part is arranged between the tamping unit and the frame, and the height adjusting part is used for keeping the tamping unit and the ground in a contact state all the time when the tamping unit works. According to the device, sundries such as broken stones on the surface layer of the ground can be cleaned before the ground is tamped, and meanwhile, in the tamping process, a large amount of dust can be avoided.
本发明属于建筑施工技术领域,提供一种建筑施工夯实装置,包括车架,车架的底部设置有车轮,车架的一端固定连接有牵引杆;土层碎石筛出单元,土层碎石筛出单元设置在车架上靠近牵引杆的一侧,土层碎石筛出单元与地表土层对应设置,土层碎石筛出单元用于在夯实土层前对土层表面的大颗粒碎石进行筛出;夯实单元,夯实单元设置在车架上远离牵引杆的一侧,夯实单元与地面对应设置,用于对地面进行夯实作业;高度调节部,高度调节部设置在夯实单元与车架之间,高度调节部用于在夯实单元作业时保持夯实单元与地面始终为接触状态。本发明可以在夯实地面前对地面表层的碎石等杂物进行清理,同时在夯实过程中,可以避免大量灰尘出现。
Building construction tamping device
一种建筑施工夯实装置
CHI CHUNYAN (author) / ZHAN MEIQIU (author) / YAN BO (author) / ZHENG SEN (author) / JIANG XIN (author) / ZHANG ZHONGSONG (author)
2023-08-01
Patent
Electronic Resource
Chinese