Tower crane foundation located in foundation pit and construction method of retaining wall of tower crane foundation
The invention relates to a tower crane foundation located in a foundation pit and a construction method of a retaining wall of the tower crane foundation. The construction method comprises the following steps that firstly, a scheme of the tower crane foundation is determined; 2, preparation work of retaining wall construction before backfilling; thirdly, a template is manufactured; fourthly, steel bars are bound; 5, a formwork is installed; sixthly, concrete pouring is conducted; seventhly, reinforcing steel bars are bound; 8, the formwork is dismantled; and ninthly, the fourth step to the eighth step are repeated, and the construction content of the whole tower crane foundation retaining wall is completed in a segmented mode. Construction is carried out layer by layer according to the segmented height, the effect of backfilling and construction at the same time is achieved, and the requirements for manpower and material resources are reduced.
本发明涉及一种位于基坑内的塔吊基础及其挡土墙的施工方法,它包括如下步骤:步骤一:确定塔吊基础的方案;步骤二:回填土前挡墙施工准备工作;步骤三:模板制作;步骤四:钢筋绑扎;步骤五:模板安装;步骤六:混凝土浇筑;步骤七:钢筋绑扎;步骤八:模板拆除;步骤九:重复上述步骤四‑步骤八,分段完成整个塔吊基础挡土墙的施工内容。本发明按照分段高度逐层施工,达到边回填边施工的效果,减少了人力物力的需求。
Tower crane foundation located in foundation pit and construction method of retaining wall of tower crane foundation
The invention relates to a tower crane foundation located in a foundation pit and a construction method of a retaining wall of the tower crane foundation. The construction method comprises the following steps that firstly, a scheme of the tower crane foundation is determined; 2, preparation work of retaining wall construction before backfilling; thirdly, a template is manufactured; fourthly, steel bars are bound; 5, a formwork is installed; sixthly, concrete pouring is conducted; seventhly, reinforcing steel bars are bound; 8, the formwork is dismantled; and ninthly, the fourth step to the eighth step are repeated, and the construction content of the whole tower crane foundation retaining wall is completed in a segmented mode. Construction is carried out layer by layer according to the segmented height, the effect of backfilling and construction at the same time is achieved, and the requirements for manpower and material resources are reduced.
本发明涉及一种位于基坑内的塔吊基础及其挡土墙的施工方法,它包括如下步骤:步骤一:确定塔吊基础的方案;步骤二:回填土前挡墙施工准备工作;步骤三:模板制作;步骤四:钢筋绑扎;步骤五:模板安装;步骤六:混凝土浇筑;步骤七:钢筋绑扎;步骤八:模板拆除;步骤九:重复上述步骤四‑步骤八,分段完成整个塔吊基础挡土墙的施工内容。本发明按照分段高度逐层施工,达到边回填边施工的效果,减少了人力物力的需求。
Tower crane foundation located in foundation pit and construction method of retaining wall of tower crane foundation
一种位于基坑内的塔吊基础及其挡土墙的施工方法
YANG YISONG (author) / CHEN RUI (author) / HU CHANGSHENG (author) / ZHANG WEIMIN (author) / JIN WENJIE (author)
2023-08-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Tower crane foundation for foundation pit and construction method of tower crane foundation
European Patent Office | 2020
|Method for arranging tower crane foundation and tower crane foundation structure
European Patent Office | 2023
|Tower crane foundation, tower crane and mounting method of tower crane
European Patent Office | 2024
|