A platform for research: civil engineering, architecture and urbanism
Dewatering well and geological exploration hole drainage and plugging construction method
The invention discloses a drainage and plugging construction method for a dewatering well and a geological exploration hole. The drainage and plugging construction method comprises the following steps that S1, a sump is constructed; s2, embedding a water conduit; a first gutter from the sump to the blind ditch and a second gutter from the geological exploration hole to the sump are excavated on the side edge of the sump, a first water conduit is embedded in the first gutter, and a second water conduit is embedded in the second gutter; s3, building a sump; concrete masonry is conducted in the circumferential direction of the water collecting pit, the water diversion pipe is masonry in concrete, and the water collecting pit is filled with broken stones after masonry is completed; s4, gravel filling; s5, laying a protective layer; s6, after a raft plate is laid on the protective layer, an upper main body structure is constructed; and S7, plugging the dewatering well and the water conduit. According to the drainage and plugging construction method for the dewatering well and the geological exploration hole, manpower, financial resources and material resources can be saved, normal proceeding of different construction tasks can be guaranteed, plugging construction of the dewatering well and the geological exploration hole does not need to be waited, and plugging construction is simple and reliable.
本发明公开了一种降水井及地勘孔疏排及封堵施工方法,包括如下步骤:S1:集水坑施工;S2:引水管埋设;在集水坑侧边开挖集水坑至盲沟的第一引水槽及地勘孔至集水坑第二引水槽,并在第一引水槽中埋设第一引水管,第二引水槽中埋设第二引水管;S3:集水坑砌筑;在集水坑周向进行混凝土砌筑,其中,引水管砌筑在混凝土中,砌筑完成后向集水坑中进行碎石填充;S4:碎石填充;S5:防护层铺设;S6:在防护层上方铺设筏板后进行上部主体结构建设;S7:降水井及引水管封堵。本发明提供了一种降水井及地勘孔疏排及封堵施工方法,不但可以节省人力财力物力,还可以保证不同施工任务的正常进行,不需等到降水井及地勘孔封堵施工,而且封堵施工简单可靠。
Dewatering well and geological exploration hole drainage and plugging construction method
The invention discloses a drainage and plugging construction method for a dewatering well and a geological exploration hole. The drainage and plugging construction method comprises the following steps that S1, a sump is constructed; s2, embedding a water conduit; a first gutter from the sump to the blind ditch and a second gutter from the geological exploration hole to the sump are excavated on the side edge of the sump, a first water conduit is embedded in the first gutter, and a second water conduit is embedded in the second gutter; s3, building a sump; concrete masonry is conducted in the circumferential direction of the water collecting pit, the water diversion pipe is masonry in concrete, and the water collecting pit is filled with broken stones after masonry is completed; s4, gravel filling; s5, laying a protective layer; s6, after a raft plate is laid on the protective layer, an upper main body structure is constructed; and S7, plugging the dewatering well and the water conduit. According to the drainage and plugging construction method for the dewatering well and the geological exploration hole, manpower, financial resources and material resources can be saved, normal proceeding of different construction tasks can be guaranteed, plugging construction of the dewatering well and the geological exploration hole does not need to be waited, and plugging construction is simple and reliable.
本发明公开了一种降水井及地勘孔疏排及封堵施工方法,包括如下步骤:S1:集水坑施工;S2:引水管埋设;在集水坑侧边开挖集水坑至盲沟的第一引水槽及地勘孔至集水坑第二引水槽,并在第一引水槽中埋设第一引水管,第二引水槽中埋设第二引水管;S3:集水坑砌筑;在集水坑周向进行混凝土砌筑,其中,引水管砌筑在混凝土中,砌筑完成后向集水坑中进行碎石填充;S4:碎石填充;S5:防护层铺设;S6:在防护层上方铺设筏板后进行上部主体结构建设;S7:降水井及引水管封堵。本发明提供了一种降水井及地勘孔疏排及封堵施工方法,不但可以节省人力财力物力,还可以保证不同施工任务的正常进行,不需等到降水井及地勘孔封堵施工,而且封堵施工简单可靠。
Dewatering well and geological exploration hole drainage and plugging construction method
一种降水井及地勘孔疏排及封堵施工方法
CHEN MIN (author) / LEE HYUN-SUNG (author) / LIU CHAO (author) / WANG HUICHAO (author) / DAI CHAO (author) / WU RONG (author) / ZHANG RENQIANG (author) / YU JIE (author) / LONG YETIAN (author) / BAI WENXUE (author)
2023-08-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Dewatering well plugging construction method and dewatering well plugging structure
European Patent Office | 2023
|European Patent Office | 2024
|Plugging drainage device for dewatering well and construction method
European Patent Office | 2022
|Plugging material for dewatering well and plugging construction method
European Patent Office | 2022
|