Deep foundation pit excavation method based on original basement structure
The invention discloses a deep foundation pit excavation method based on an original basement structure. The deep foundation pit excavation method comprises the steps that the range of an obstacle clearing area is determined; a foundation pit is excavated in the obstacle clearing area till a top plate of an original basement structure; pouring a concrete terrace; the pile positions of a plurality of stand column piles are positioned, so that the multiple pile positions are arranged in the obstacle clearing area range at intervals; each pile position is punched, and a stand column pile is constructed; breaking the concrete terrace and a top plate of an original basement structure; constructing a plurality of inner supports in the foundation pit; steel plates are laid on the tops of the multiple inner supports, the wall body of the original basement structure is broken downwards on the basis of the steel plates, and the foundation pit continues to be excavated till a bottom plate of the original basement structure is reached; and a bottom plate of an original basement structure is broken, original engineering piles are removed, and the construction efficiency is improved through the excavation method.
本发明公开了一种基于原有地下室结构的深基坑开挖方法,包括步骤:确定清障区域的范围;在清障区域内开挖基坑直到原有地下室结构的顶板;浇筑混凝土地坪;定位多个立柱桩的桩位,使多个所述桩位间隔布设在所述清障区域范围内;于每个所述桩位处打孔并施工立柱桩;将所述混凝土地坪以及原有地下室结构的顶板破除;在所述基坑内施工多道内支撑;在多道所述内支撑的顶部铺设钢板,以所述钢板为基础向下破除原有地下室结构的墙体,并继续开挖基坑直到原有地下室结构的底板;破除原有地下室结构的底板,并清除原有工程桩,通过上述开挖方法提高了施工效率。
Deep foundation pit excavation method based on original basement structure
The invention discloses a deep foundation pit excavation method based on an original basement structure. The deep foundation pit excavation method comprises the steps that the range of an obstacle clearing area is determined; a foundation pit is excavated in the obstacle clearing area till a top plate of an original basement structure; pouring a concrete terrace; the pile positions of a plurality of stand column piles are positioned, so that the multiple pile positions are arranged in the obstacle clearing area range at intervals; each pile position is punched, and a stand column pile is constructed; breaking the concrete terrace and a top plate of an original basement structure; constructing a plurality of inner supports in the foundation pit; steel plates are laid on the tops of the multiple inner supports, the wall body of the original basement structure is broken downwards on the basis of the steel plates, and the foundation pit continues to be excavated till a bottom plate of the original basement structure is reached; and a bottom plate of an original basement structure is broken, original engineering piles are removed, and the construction efficiency is improved through the excavation method.
本发明公开了一种基于原有地下室结构的深基坑开挖方法,包括步骤:确定清障区域的范围;在清障区域内开挖基坑直到原有地下室结构的顶板;浇筑混凝土地坪;定位多个立柱桩的桩位,使多个所述桩位间隔布设在所述清障区域范围内;于每个所述桩位处打孔并施工立柱桩;将所述混凝土地坪以及原有地下室结构的顶板破除;在所述基坑内施工多道内支撑;在多道所述内支撑的顶部铺设钢板,以所述钢板为基础向下破除原有地下室结构的墙体,并继续开挖基坑直到原有地下室结构的底板;破除原有地下室结构的底板,并清除原有工程桩,通过上述开挖方法提高了施工效率。
Deep foundation pit excavation method based on original basement structure
基于原有地下室结构的深基坑开挖方法
HE JUN (author) / WANG TAO (author) / DENG CHENGLAI (author) / JIANG SHUAI (author) / DU JIANGYU (author) / SONG ZHEN (author) / CHEN MINGHONG (author)
2023-08-18
Patent
Electronic Resource
Chinese
Deep foundation pit basement cover-excavation sequential construction method and structure thereof
European Patent Office | 2024
|Coastal area building basement fire elevator foundation pit excavation method
European Patent Office | 2023
|Method for reducing foundation pit excavation by raising basement core tube elevation
European Patent Office | 2022
|