A platform for research: civil engineering, architecture and urbanism
Manual hole digging pile reinforcement cage positioning method
The invention discloses a manual hole digging pile reinforcement cage positioning method, and relates to the technical field of constructional engineering. The manual hole digging pile reinforcement cage positioning method specifically comprises the following steps that a circular reinforcement ring with the same diameter as a reinforcement cage is manufactured, a cross is welded to the center, the center of the cross serves as the circle center, and the reinforcement cage is horizontally welded to a vertical reinforcement of the reinforcement cage during installation and is called a reinforcement cage center support for short. The reinforcement cage center support needs to be horizontally installed and is controlled by a theodolite or a total station. According to the manual hole digging pile reinforcement cage positioning method, the installation precision of the manual hole digging pile reinforcement cage is improved conveniently in the construction process, the influence of installation deviation of the manual hole digging pile reinforcement cage on the engineering quality is greatly reduced, and the working efficiency is improved to a great extent.
本发明公开了一种人工挖孔桩钢筋笼定位方法,涉及建筑工程技术领域。该人工挖孔桩钢筋笼定位方法,具体操作如下:制作一个与钢筋笼直径一样的圆形钢筋环,中心焊一个十字架,十字架中心为圆心,钢筋笼安装时水平焊接于钢筋笼的竖直钢筋上,简称钢筋笼中心支架。钢筋笼中心支架安装时需要水平,利用经纬仪或全站仪控制。该人工挖孔桩钢筋笼定位方法,便于施工过程中提高人工挖孔桩的钢筋笼安装的精度,大大降低人工挖孔桩钢筋笼安装偏位对工程质量的影响,极大程度上提高了工作效率。
Manual hole digging pile reinforcement cage positioning method
The invention discloses a manual hole digging pile reinforcement cage positioning method, and relates to the technical field of constructional engineering. The manual hole digging pile reinforcement cage positioning method specifically comprises the following steps that a circular reinforcement ring with the same diameter as a reinforcement cage is manufactured, a cross is welded to the center, the center of the cross serves as the circle center, and the reinforcement cage is horizontally welded to a vertical reinforcement of the reinforcement cage during installation and is called a reinforcement cage center support for short. The reinforcement cage center support needs to be horizontally installed and is controlled by a theodolite or a total station. According to the manual hole digging pile reinforcement cage positioning method, the installation precision of the manual hole digging pile reinforcement cage is improved conveniently in the construction process, the influence of installation deviation of the manual hole digging pile reinforcement cage on the engineering quality is greatly reduced, and the working efficiency is improved to a great extent.
本发明公开了一种人工挖孔桩钢筋笼定位方法,涉及建筑工程技术领域。该人工挖孔桩钢筋笼定位方法,具体操作如下:制作一个与钢筋笼直径一样的圆形钢筋环,中心焊一个十字架,十字架中心为圆心,钢筋笼安装时水平焊接于钢筋笼的竖直钢筋上,简称钢筋笼中心支架。钢筋笼中心支架安装时需要水平,利用经纬仪或全站仪控制。该人工挖孔桩钢筋笼定位方法,便于施工过程中提高人工挖孔桩的钢筋笼安装的精度,大大降低人工挖孔桩钢筋笼安装偏位对工程质量的影响,极大程度上提高了工作效率。
Manual hole digging pile reinforcement cage positioning method
一种人工挖孔桩钢筋笼定位方法
CHEN SHUXIA (author) / LI XINWEN (author) / CHEN BO (author) / ZHAO GUOHUI (author) / YANG BING (author)
2023-08-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for installing reinforcement cage in hole of manual hole digging pile
European Patent Office | 2022
|Manual hole digging pile and construction method of manual hole digging pile
European Patent Office | 2020
|Construction method of manual hole digging pile and manual hole digging pile
European Patent Office | 2021
|Manual hole digging pile and construction method of manual hole digging pile
European Patent Office | 2020
|European Patent Office | 2024
|