A platform for research: civil engineering, architecture and urbanism
The invention discloses a damping stair formwork for building construction and an assembling method thereof, and belongs to the technical field of stair formworks, the damping stair formwork comprises a bottom plate, two side baffles and a plurality of fixed baffles, the two side baffles are fixedly mounted at the top of the bottom plate through bolts, and the fixed baffles are fixedly mounted at the top of the bottom plate; the device further comprises two fixing bases, two abutting plates and a plurality of bearing plates, the two abutting plates are located on the sides, away from each other, of the baffles on the two sides respectively, the two fixing bases are fixedly installed on the top of the bottom plate, and the two fixing bases are each provided with a moving assembly used for driving one abutting plate to move in the direction close to or away from the baffle on one side. The multiple bearing plates are located on the tops of the two fixing bases and distributed in the length direction of the bottom plate, and the two fixing bases are each provided with a buffering assembly for buffering the bearing plates. The concrete pouring device has the effects that the stability of the positions of the baffles on the two sides in the concrete pouring process is guaranteed, and then the final pouring forming quality of concrete is guaranteed.
本发明公开了一种建筑施工用减震楼梯模板及其组装方法,属于楼梯模板的技术领域,其包括底板、两侧挡板以及固定挡板,两侧挡板均通过螺栓固定安装于底板顶部,固定挡板设置有若干且均固定安装于底板顶部,还包括两固定座、两抵压板以及若干承载板,两抵压板分别位于两侧挡板相远离的一侧,两固定座均固定安装于底板顶部,两固定座均设置有用于驱动其中一抵压板朝靠近或远离其中一侧挡板方向运动的运动组件,若干承载板均位于两固定座的顶部并沿底板的长度方向分布,两固定座均设置有对承载板进行缓冲的缓冲组件。本申请具有保证两侧挡板在混凝土浇筑过程中所在位置的稳定性,进而保证混凝土最终的浇筑成型质量的效果。
The invention discloses a damping stair formwork for building construction and an assembling method thereof, and belongs to the technical field of stair formworks, the damping stair formwork comprises a bottom plate, two side baffles and a plurality of fixed baffles, the two side baffles are fixedly mounted at the top of the bottom plate through bolts, and the fixed baffles are fixedly mounted at the top of the bottom plate; the device further comprises two fixing bases, two abutting plates and a plurality of bearing plates, the two abutting plates are located on the sides, away from each other, of the baffles on the two sides respectively, the two fixing bases are fixedly installed on the top of the bottom plate, and the two fixing bases are each provided with a moving assembly used for driving one abutting plate to move in the direction close to or away from the baffle on one side. The multiple bearing plates are located on the tops of the two fixing bases and distributed in the length direction of the bottom plate, and the two fixing bases are each provided with a buffering assembly for buffering the bearing plates. The concrete pouring device has the effects that the stability of the positions of the baffles on the two sides in the concrete pouring process is guaranteed, and then the final pouring forming quality of concrete is guaranteed.
本发明公开了一种建筑施工用减震楼梯模板及其组装方法,属于楼梯模板的技术领域,其包括底板、两侧挡板以及固定挡板,两侧挡板均通过螺栓固定安装于底板顶部,固定挡板设置有若干且均固定安装于底板顶部,还包括两固定座、两抵压板以及若干承载板,两抵压板分别位于两侧挡板相远离的一侧,两固定座均固定安装于底板顶部,两固定座均设置有用于驱动其中一抵压板朝靠近或远离其中一侧挡板方向运动的运动组件,若干承载板均位于两固定座的顶部并沿底板的长度方向分布,两固定座均设置有对承载板进行缓冲的缓冲组件。本申请具有保证两侧挡板在混凝土浇筑过程中所在位置的稳定性,进而保证混凝土最终的浇筑成型质量的效果。
Damping stair formwork for building construction and assembling method thereof
一种建筑施工用减震楼梯模板及其组装方法
2023-08-22
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Damping stair formwork for building construction and assembling method thereof
European Patent Office | 2020
|Stair formwork and stair construction method adopting same
European Patent Office | 2015
|