Deep foundation pit steel-concrete combined inner support efficient dismantling system and construction method
According to the deep foundation pit steel-concrete combined inner support efficient dismantling system and the construction method, through two-dimensional code informatization coding, constructors can know the dismantling sequence and process of all parts to be dismantled through two-dimensional codes, it is guaranteed that the dismantling process is carried out in order, and the dismantling efficiency is improved. The three-dimensional laser scanning measuring instrument can directly measure the parts to be disassembled through the laser scanning technology, data can be directly transmitted into a computer system, disassembly and temporary support point positions of the parts to be disassembled are calculated, the measuring efficiency and precision are remarkably improved, and meanwhile the labor cost is reduced. Meanwhile, the concrete inner support supporting system, the dismounting safety operation platform and the profile steel stand column supporting system directly support the to-be-dismounted support and the stand column, and compared with a traditional mode of constructing a temporary support for supporting, the device is higher in construction efficiency and lower in labor cost, and the supporting device can be repeatedly used.
本发明涉及一种深基坑钢‑混组合内支撑高效拆除体系及施工方法,通过二维码信息化编码可使施工人员通过二维码即可了解各待拆卸部件拆卸顺序及工艺,保证拆卸过程有序进行,提高拆卸效率。三维激光扫描测量仪可通过激光扫描技术直接对待拆卸部件进行测量,并可直接将数据传入计算机系统内,对各待拆卸部件拆卸和临时支护点位进行计算,显著提高了测量效率与精度,同时减小人工成本。同时,混凝土内支撑支护体系、拆卸安全操作平台和型钢立柱支护体系直接对待拆卸支撑及立柱进行支护,相较于传统搭建临时支架方式进行支护,装置施工效率更高,人工成本较低,且支护装置可重复使用。
Deep foundation pit steel-concrete combined inner support efficient dismantling system and construction method
According to the deep foundation pit steel-concrete combined inner support efficient dismantling system and the construction method, through two-dimensional code informatization coding, constructors can know the dismantling sequence and process of all parts to be dismantled through two-dimensional codes, it is guaranteed that the dismantling process is carried out in order, and the dismantling efficiency is improved. The three-dimensional laser scanning measuring instrument can directly measure the parts to be disassembled through the laser scanning technology, data can be directly transmitted into a computer system, disassembly and temporary support point positions of the parts to be disassembled are calculated, the measuring efficiency and precision are remarkably improved, and meanwhile the labor cost is reduced. Meanwhile, the concrete inner support supporting system, the dismounting safety operation platform and the profile steel stand column supporting system directly support the to-be-dismounted support and the stand column, and compared with a traditional mode of constructing a temporary support for supporting, the device is higher in construction efficiency and lower in labor cost, and the supporting device can be repeatedly used.
本发明涉及一种深基坑钢‑混组合内支撑高效拆除体系及施工方法,通过二维码信息化编码可使施工人员通过二维码即可了解各待拆卸部件拆卸顺序及工艺,保证拆卸过程有序进行,提高拆卸效率。三维激光扫描测量仪可通过激光扫描技术直接对待拆卸部件进行测量,并可直接将数据传入计算机系统内,对各待拆卸部件拆卸和临时支护点位进行计算,显著提高了测量效率与精度,同时减小人工成本。同时,混凝土内支撑支护体系、拆卸安全操作平台和型钢立柱支护体系直接对待拆卸支撑及立柱进行支护,相较于传统搭建临时支架方式进行支护,装置施工效率更高,人工成本较低,且支护装置可重复使用。
Deep foundation pit steel-concrete combined inner support efficient dismantling system and construction method
深基坑钢-混组合内支撑高效拆除体系及施工方法
WANG TAO (author) / QU KEJIN (author) / WU XIANGFEI (author) / JIANG SHUAI (author) / LI YUN (author)
2023-09-01
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|European Patent Office | 2024
|Construction method for dismantling ultrahigh inner support of deep foundation pit
European Patent Office | 2022
|Construction method for dismantling inner support of foundation pit
European Patent Office | 2024
|