Concrete electric pole production process, electric pole framework and electric pole
The invention relates to a concrete electric pole production process, an electric pole framework and an electric pole, and relates to the field of electric pole production.The concrete electric pole production process comprises the following steps that main reinforcements, auxiliary reinforcements and spiral reinforcements are welded to form the framework, PC steel bars serve as the main reinforcements, and deformed steel bars serve as the auxiliary reinforcements; the length of each auxiliary rib is smaller than that of the main rib, a lengthening rod is detachably connected to one end of each auxiliary rib, then one end of the main rib and the end, provided with the lengthening rod, of each auxiliary rib are fixed to a seam welder, and the main rib, the auxiliary ribs and the spiral ribs are welded into a framework through the seam welder; after the framework is welded, the framework and the seam welder are detached and separated, and then the lengthening rod at one end of each auxiliary rib is detached; anchoring discs are mounted at two ends of the framework; the main reinforcements at each end of the framework are fixedly connected with the same anchoring disc; loading the framework into a mold, feeding and closing the mold, wherein after the framework is loaded into the mold, the auxiliary ribs are completely arranged in the mold; centrifugally forming; performing maintenance; and demolding and detaching the anchoring disc. The framework welding device has the effect of improving the framework welding efficiency.
本申请涉及一种混凝土电杆生产工艺、电杆骨架及电杆,涉及电杆生产的领域,混凝土电杆生产工艺,包括如下步骤:主筋、副筋以及螺旋筋焊接形成骨架:PC钢棒作为主筋,螺纹钢作为副筋;副筋的长度小于主筋的长度,在副筋的一端可拆卸连接加长杆,随后将主筋的一端和每个副筋安装有加长杆的一端均固定在滚焊机上,通过滚焊机将主筋、副筋和螺旋筋焊接成骨架;骨架焊接完成后,将骨架与滚焊机拆卸分离,随后将每个副筋一端的加长杆拆卸;骨架两端安装锚固盘:骨架每端的主筋均与同一个锚固盘紧固连接;骨架装入模具、喂料、合模:骨架装入模具后,副筋完全置于模具内部;离心成型;养护;脱模并拆卸锚固盘。本申请具有提高骨架焊接效率的效果。
Concrete electric pole production process, electric pole framework and electric pole
The invention relates to a concrete electric pole production process, an electric pole framework and an electric pole, and relates to the field of electric pole production.The concrete electric pole production process comprises the following steps that main reinforcements, auxiliary reinforcements and spiral reinforcements are welded to form the framework, PC steel bars serve as the main reinforcements, and deformed steel bars serve as the auxiliary reinforcements; the length of each auxiliary rib is smaller than that of the main rib, a lengthening rod is detachably connected to one end of each auxiliary rib, then one end of the main rib and the end, provided with the lengthening rod, of each auxiliary rib are fixed to a seam welder, and the main rib, the auxiliary ribs and the spiral ribs are welded into a framework through the seam welder; after the framework is welded, the framework and the seam welder are detached and separated, and then the lengthening rod at one end of each auxiliary rib is detached; anchoring discs are mounted at two ends of the framework; the main reinforcements at each end of the framework are fixedly connected with the same anchoring disc; loading the framework into a mold, feeding and closing the mold, wherein after the framework is loaded into the mold, the auxiliary ribs are completely arranged in the mold; centrifugally forming; performing maintenance; and demolding and detaching the anchoring disc. The framework welding device has the effect of improving the framework welding efficiency.
本申请涉及一种混凝土电杆生产工艺、电杆骨架及电杆,涉及电杆生产的领域,混凝土电杆生产工艺,包括如下步骤:主筋、副筋以及螺旋筋焊接形成骨架:PC钢棒作为主筋,螺纹钢作为副筋;副筋的长度小于主筋的长度,在副筋的一端可拆卸连接加长杆,随后将主筋的一端和每个副筋安装有加长杆的一端均固定在滚焊机上,通过滚焊机将主筋、副筋和螺旋筋焊接成骨架;骨架焊接完成后,将骨架与滚焊机拆卸分离,随后将每个副筋一端的加长杆拆卸;骨架两端安装锚固盘:骨架每端的主筋均与同一个锚固盘紧固连接;骨架装入模具、喂料、合模:骨架装入模具后,副筋完全置于模具内部;离心成型;养护;脱模并拆卸锚固盘。本申请具有提高骨架焊接效率的效果。
Concrete electric pole production process, electric pole framework and electric pole
一种混凝土电杆生产工艺、电杆骨架及电杆
LI HONGLIANG (author) / HAO BAOJUN (author) / JIA GUOQUAN (author) / LIU JUN (author)
2023-09-19
Patent
Electronic Resource
Chinese
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
European Patent Office | 2021
|