Construction method of pedestrian landscape bridge underneath passing through bridge pier door opening of existing viaduct
The invention discloses a construction method of a pedestrian landscape bridge underneath passing through an existing viaduct bridge pier door opening. A connecting piece is pre-buried when a viaduct box girder is prefabricated; an upper lifting base is installed below the viaduct box girder and fixed to the connecting piece; a hanging bracket is mounted on the upper hanging seat of the support part, a track is mounted on the hanging bracket and penetrates through a bridge pier door opening, gaps are reserved in the two sides of a bridge pier respectively to be connected with the upper hanging seat of a bridge plate of the pedestrian landscape bridge penetrating through the bridge pier door opening, and a plurality of hoist cranes are mounted on the track; the bridge plate is provided with a lower lifting seat; the bridge plate is transferred to the position between the two bridge piers, a hoist crane is connected with the bridge plate, the bridge plate is hoisted to the set height, then the hoist crane is moved along the track, one end of the bridge plate penetrates through a bridge pier door opening, then the bridge plate is lowered to the installation position through the hoist crane, and the corresponding lower hoisting bases and the corresponding upper hoisting bases are connected through hoisting rods; and removing the hoist, the track and the hanging bracket. The pedestrian landscape bridge has the effect that the pedestrian landscape bridge can be conveniently constructed by relying on an existing viaduct pier door opening.
本申请公开了一种下穿现有高架桥桥墩门洞人行景观桥施工方法,其在高架桥箱梁预制时预埋连接件;在高架桥箱梁的下方安装上吊座,上吊座固定于连接件;依托部分上吊座安装吊架,吊架上安装有轨道,轨道贯穿桥墩门洞,桥墩的两侧分别留空连接穿过该桥墩门洞的人行景观桥的桥板的上吊座,在轨道上安装多个葫芦吊;桥板安装有下吊座;将桥板转运至两个桥墩之间,将葫芦吊连接桥板,将桥板吊起至设定高度,再沿轨道移动葫芦吊,使得桥板的一端从桥墩门洞中穿过,之后通过葫芦吊将桥板下放至安装位置,通过吊杆连接对应的下吊座和上吊座;拆除葫芦吊、轨道和吊架。本申请具有方便依托现有高架桥桥墩门洞施工人行景观桥的效果。
Construction method of pedestrian landscape bridge underneath passing through bridge pier door opening of existing viaduct
The invention discloses a construction method of a pedestrian landscape bridge underneath passing through an existing viaduct bridge pier door opening. A connecting piece is pre-buried when a viaduct box girder is prefabricated; an upper lifting base is installed below the viaduct box girder and fixed to the connecting piece; a hanging bracket is mounted on the upper hanging seat of the support part, a track is mounted on the hanging bracket and penetrates through a bridge pier door opening, gaps are reserved in the two sides of a bridge pier respectively to be connected with the upper hanging seat of a bridge plate of the pedestrian landscape bridge penetrating through the bridge pier door opening, and a plurality of hoist cranes are mounted on the track; the bridge plate is provided with a lower lifting seat; the bridge plate is transferred to the position between the two bridge piers, a hoist crane is connected with the bridge plate, the bridge plate is hoisted to the set height, then the hoist crane is moved along the track, one end of the bridge plate penetrates through a bridge pier door opening, then the bridge plate is lowered to the installation position through the hoist crane, and the corresponding lower hoisting bases and the corresponding upper hoisting bases are connected through hoisting rods; and removing the hoist, the track and the hanging bracket. The pedestrian landscape bridge has the effect that the pedestrian landscape bridge can be conveniently constructed by relying on an existing viaduct pier door opening.
本申请公开了一种下穿现有高架桥桥墩门洞人行景观桥施工方法,其在高架桥箱梁预制时预埋连接件;在高架桥箱梁的下方安装上吊座,上吊座固定于连接件;依托部分上吊座安装吊架,吊架上安装有轨道,轨道贯穿桥墩门洞,桥墩的两侧分别留空连接穿过该桥墩门洞的人行景观桥的桥板的上吊座,在轨道上安装多个葫芦吊;桥板安装有下吊座;将桥板转运至两个桥墩之间,将葫芦吊连接桥板,将桥板吊起至设定高度,再沿轨道移动葫芦吊,使得桥板的一端从桥墩门洞中穿过,之后通过葫芦吊将桥板下放至安装位置,通过吊杆连接对应的下吊座和上吊座;拆除葫芦吊、轨道和吊架。本申请具有方便依托现有高架桥桥墩门洞施工人行景观桥的效果。
Construction method of pedestrian landscape bridge underneath passing through bridge pier door opening of existing viaduct
一种下穿现有高架桥桥墩门洞人行景观桥施工方法
DENG GANG (author) / ZHANG LEPING (author) / YIN YICHAO (author) / WANG DINGXIANG (author) / GONG YINGFA (author) / WU FAN (author) / LI HONGWEI (author)
2023-09-29
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method for tunnel underneath passing through existing bridge pile foundation
European Patent Office | 2023
|European Patent Office | 2020
|Construction method of subway shield tunnel underneath passing viaduct tunnel
European Patent Office | 2022
|Viaduct construction method of overcrossing existing ground bridge
European Patent Office | 2020
|