Real-time monitoring method for impermeable cement grouting
The embodiment of the invention relates to the field of engineering construction, and discloses a real-time monitoring method for impermeable cement grouting. According to the method, the anti-seepage groove is dug in the side of the communication pipeline, so that the seepage pressure of cement paste is conveniently released in the cement grouting process; parameters of the anti-seepage groove are determined according to a foundation pit site, a communication pipeline and a grouting mode, it is ensured that the dug anti-seepage groove can be attached to the actual size of the foundation pit, and therefore the situation of cement paste seepage in the cement grouting process is effectively prevented; and the accumulation condition of the cement paste in the anti-permeation groove is monitored in real time through the infrared grating alarm, and excessive permeation cement paste is prevented and pumped out in advance, so that the cement paste is prevented from permeating into the communication pipeline, and the economic loss is reduced.
本发明实施例涉及工程施工领域,公开了一种防渗透水泥注浆的实时监控方法。本发明中,通过在通信管线侧挖出防渗透沟槽,便于在水泥注浆过程中释放水泥浆的渗透压力;根据基坑场地和通信管道以及注浆方式确定防渗透沟槽的参数,确保挖出的防渗透沟槽可贴合基坑的实际大小,从而有效预防水泥注浆过程中的水泥浆渗透的情况;并且通过红外线光栅报警器对防渗透沟槽内的水泥浆积累情况进行实时监控,提早预防并抽出过量渗透的水泥浆,从而防止水泥浆渗透至通信管道,减少经济损失。
Real-time monitoring method for impermeable cement grouting
The embodiment of the invention relates to the field of engineering construction, and discloses a real-time monitoring method for impermeable cement grouting. According to the method, the anti-seepage groove is dug in the side of the communication pipeline, so that the seepage pressure of cement paste is conveniently released in the cement grouting process; parameters of the anti-seepage groove are determined according to a foundation pit site, a communication pipeline and a grouting mode, it is ensured that the dug anti-seepage groove can be attached to the actual size of the foundation pit, and therefore the situation of cement paste seepage in the cement grouting process is effectively prevented; and the accumulation condition of the cement paste in the anti-permeation groove is monitored in real time through the infrared grating alarm, and excessive permeation cement paste is prevented and pumped out in advance, so that the cement paste is prevented from permeating into the communication pipeline, and the economic loss is reduced.
本发明实施例涉及工程施工领域,公开了一种防渗透水泥注浆的实时监控方法。本发明中,通过在通信管线侧挖出防渗透沟槽,便于在水泥注浆过程中释放水泥浆的渗透压力;根据基坑场地和通信管道以及注浆方式确定防渗透沟槽的参数,确保挖出的防渗透沟槽可贴合基坑的实际大小,从而有效预防水泥注浆过程中的水泥浆渗透的情况;并且通过红外线光栅报警器对防渗透沟槽内的水泥浆积累情况进行实时监控,提早预防并抽出过量渗透的水泥浆,从而防止水泥浆渗透至通信管道,减少经济损失。
Real-time monitoring method for impermeable cement grouting
一种防渗透水泥注浆的实时监控方法
ZHOU WEI (author) / NI JIGANG (author) / CAO FENGBIN (author)
2023-09-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
G08B
SIGNALLING OR CALLING SYSTEMS
,
Signalisier- oder Rufsysteme
Impermeable layer bedrock curtain grouting device and method
European Patent Office | 2024
|Impermeable pile foundation grouting material and application thereof
European Patent Office | 2024
|Impermeable shield inert synchronous grouting material and preparation method thereof
European Patent Office | 2023
|