A platform for research: civil engineering, architecture and urbanism
The invention discloses a steel sheet pile construction method. The method comprises the steps that firstly, a steel sheet pile is subjected to anti-corrosion treatment; step 2, placing a pile sinking plane position line according to a design drawing, controlling the design elevation of the steel sheet pile according to the existing elevation point, and measuring, paying off and positioning; thirdly, steel sheet pile guide frames are installed on a trestle which is built in advance behind the berth and the cast-in-place piles which are driven in advance; fourthly, steel sheet pile numbers are marked on the steel sheet piles according to the construction sequence, scale waterlines are marked on the steel sheet piles, the steel sheet piles are transported to a trestle behind a berth, and lock catches of the steel sheet piles are brushed with butter; 5, driving steel sheet piles by means of a steel sheet pile guide frame; and sixthly, an anode protection block is installed on the underwater part of each steel sheet pile. The device is matched with a steel sheet pile guide mechanism for use, so that the steel sheet pile can be accurately positioned and driven.
本发明公开了一种钢板桩施工方法,包括:步骤一、对钢板桩进行防腐处理;步骤二、根据设计图纸放沉桩平面位置线,根据已有的标高点控制钢板桩设计标高,测量放线定位;步骤三、在泊位后方预先搭建的栈桥和预先打入的灌注桩上安装钢板桩导向架;步骤四、根据施工打顺序在钢板桩上标注钢板桩编号,并在钢板桩上标注刻度水线,将钢板桩运输至泊位后方的栈桥上,用黄油涂刷钢板桩锁扣;步骤五、借助钢板桩导向架打设钢板桩;步骤六、在每块钢板桩的水下部分安装阳极保护块。本发明通过与钢板桩导向机构配合使用,能够使钢板桩准确定位施打。
The invention discloses a steel sheet pile construction method. The method comprises the steps that firstly, a steel sheet pile is subjected to anti-corrosion treatment; step 2, placing a pile sinking plane position line according to a design drawing, controlling the design elevation of the steel sheet pile according to the existing elevation point, and measuring, paying off and positioning; thirdly, steel sheet pile guide frames are installed on a trestle which is built in advance behind the berth and the cast-in-place piles which are driven in advance; fourthly, steel sheet pile numbers are marked on the steel sheet piles according to the construction sequence, scale waterlines are marked on the steel sheet piles, the steel sheet piles are transported to a trestle behind a berth, and lock catches of the steel sheet piles are brushed with butter; 5, driving steel sheet piles by means of a steel sheet pile guide frame; and sixthly, an anode protection block is installed on the underwater part of each steel sheet pile. The device is matched with a steel sheet pile guide mechanism for use, so that the steel sheet pile can be accurately positioned and driven.
本发明公开了一种钢板桩施工方法,包括:步骤一、对钢板桩进行防腐处理;步骤二、根据设计图纸放沉桩平面位置线,根据已有的标高点控制钢板桩设计标高,测量放线定位;步骤三、在泊位后方预先搭建的栈桥和预先打入的灌注桩上安装钢板桩导向架;步骤四、根据施工打顺序在钢板桩上标注钢板桩编号,并在钢板桩上标注刻度水线,将钢板桩运输至泊位后方的栈桥上,用黄油涂刷钢板桩锁扣;步骤五、借助钢板桩导向架打设钢板桩;步骤六、在每块钢板桩的水下部分安装阳极保护块。本发明通过与钢板桩导向机构配合使用,能够使钢板桩准确定位施打。
Steel sheet pile construction method
钢板桩施工方法
ZHANG HUAQIANG (author)
2023-10-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL SHEET PILE, AND CONSTRUCTION METHOD OF STEEL SHEET PILE
European Patent Office | 2022
|European Patent Office | 2015
|European Patent Office | 2021
|