A steel sheet pile construction method, comprising: a first step of performing an anti-corrosion treatment on steel sheet piles (4); a second step of placing, according to a design drawing, a plane position line for pile sinking, controlling designed elevations of the steel sheet piles (4) according to an existing elevation point, and performing measurement, paying-off and positioning; a third step of mounting a steel sheet pile guide frame (3) on a trestle (1) pre-built behind a berth and a pre-driven cast-in-place pile (2); a fourth step of marking a number on each of the steel sheet piles (4) according to a driving sequence, marking scale water lines on the steel sheet piles (4), transporting the steel sheet piles (4) to the trestle (1) behind the berth, and brushing lock catches of the steel sheet piles (4) with butter; a fifth step of driving the steel sheet piles (4) with the aid of the steel sheet pile guide frame (3); and a sixth step of mounting an anode protection block on an underwater portion of each steel sheet pile (4). The method is used in combination with a steel sheet pile guiding mechanism, which enables accurate positioning and driving of the steel sheet piles.
L'invention concerne un procédé de construction de palplanche en acier, comprenant : une première étape de réalisation d'un traitement anti-corrosion sur des palplanches en acier (4); une deuxième étape de placement, selon un dessin de conception, d'une ligne de position plane pour l'enfoncement de pieu, de commande d'élévations conçues des palplanches en acier (4) selon un point d'élévation existant et de réalisation d'une mesure, d'un déroulement et d'un positionnement; une troisième étape de montage d'un cadre de guidage de palplanche en acier (3) sur un tréteau (1) pré-construit derrière un quai et un pieu coulé sur place pré-entraîné (2); une quatrième étape de marquage d'un numéro sur chacune des palplanches en acier (4) selon une séquence d'entraînement, de marquage de lignes d'eau à l'échelle sur les palplanches en acier (4), de transport des palplanches en acier (4) vers le tréteau (1) derrière le quai et de brossage des loquets de verrouillage des palplanches en acier (4) avec du beurre; une cinquième étape d'entraînement des palplanches en acier (4) à l'aide du cadre de guidage de palplanche en acier (3); et une sixième étape de montage d'un bloc de protection d'anode sur une partie sous-marine de chaque palplanche en acier (4). Le procédé est utilisé en combinaison avec un mécanisme de guidage de palplanche en acier, qui permet un positionnement et un entraînement précis des palplanches en acier.
一种钢板桩施工方法,包括:步骤一、对钢板桩(4)进行防腐处理;步骤二、根据设计图纸放沉桩平面位置线,根据已有的标高点控制钢板桩(4)设计标高,测量放线定位;步骤三、在泊位后方预先搭建的栈桥(1)和预先打入的灌注桩(2)上安装钢板桩导向架(3);步骤四、根据施打顺序在钢板桩(4)上标注钢板桩编号,并在钢板桩(4)上标注刻度水线,将钢板桩(4)运输至泊位后方的栈桥(1)上,用黄油涂刷钢板桩(4)锁扣;步骤五、借助钢板桩导向架(3)打设钢板桩(4);步骤六、在每块钢板桩(4)的水下部分安装阳极保护块。该方法通过与钢板桩导向机构配合使用,能够使钢板桩准确定位施打。
A steel sheet pile construction method, comprising: a first step of performing an anti-corrosion treatment on steel sheet piles (4); a second step of placing, according to a design drawing, a plane position line for pile sinking, controlling designed elevations of the steel sheet piles (4) according to an existing elevation point, and performing measurement, paying-off and positioning; a third step of mounting a steel sheet pile guide frame (3) on a trestle (1) pre-built behind a berth and a pre-driven cast-in-place pile (2); a fourth step of marking a number on each of the steel sheet piles (4) according to a driving sequence, marking scale water lines on the steel sheet piles (4), transporting the steel sheet piles (4) to the trestle (1) behind the berth, and brushing lock catches of the steel sheet piles (4) with butter; a fifth step of driving the steel sheet piles (4) with the aid of the steel sheet pile guide frame (3); and a sixth step of mounting an anode protection block on an underwater portion of each steel sheet pile (4). The method is used in combination with a steel sheet pile guiding mechanism, which enables accurate positioning and driving of the steel sheet piles.
L'invention concerne un procédé de construction de palplanche en acier, comprenant : une première étape de réalisation d'un traitement anti-corrosion sur des palplanches en acier (4); une deuxième étape de placement, selon un dessin de conception, d'une ligne de position plane pour l'enfoncement de pieu, de commande d'élévations conçues des palplanches en acier (4) selon un point d'élévation existant et de réalisation d'une mesure, d'un déroulement et d'un positionnement; une troisième étape de montage d'un cadre de guidage de palplanche en acier (3) sur un tréteau (1) pré-construit derrière un quai et un pieu coulé sur place pré-entraîné (2); une quatrième étape de marquage d'un numéro sur chacune des palplanches en acier (4) selon une séquence d'entraînement, de marquage de lignes d'eau à l'échelle sur les palplanches en acier (4), de transport des palplanches en acier (4) vers le tréteau (1) derrière le quai et de brossage des loquets de verrouillage des palplanches en acier (4) avec du beurre; une cinquième étape d'entraînement des palplanches en acier (4) à l'aide du cadre de guidage de palplanche en acier (3); et une sixième étape de montage d'un bloc de protection d'anode sur une partie sous-marine de chaque palplanche en acier (4). Le procédé est utilisé en combinaison avec un mécanisme de guidage de palplanche en acier, qui permet un positionnement et un entraînement précis des palplanches en acier.
一种钢板桩施工方法,包括:步骤一、对钢板桩(4)进行防腐处理;步骤二、根据设计图纸放沉桩平面位置线,根据已有的标高点控制钢板桩(4)设计标高,测量放线定位;步骤三、在泊位后方预先搭建的栈桥(1)和预先打入的灌注桩(2)上安装钢板桩导向架(3);步骤四、根据施打顺序在钢板桩(4)上标注钢板桩编号,并在钢板桩(4)上标注刻度水线,将钢板桩(4)运输至泊位后方的栈桥(1)上,用黄油涂刷钢板桩(4)锁扣;步骤五、借助钢板桩导向架(3)打设钢板桩(4);步骤六、在每块钢板桩(4)的水下部分安装阳极保护块。该方法通过与钢板桩导向机构配合使用,能够使钢板桩准确定位施打。
STEEL SHEET PILE CONSTRUCTION METHOD
PROCÉDÉ DE CONSTRUCTION DE PALPLANCHE EN ACIER
钢板桩施工方法
ZHANG HUAQIANG (author)
2025-01-23
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL SHEET PILE, AND CONSTRUCTION METHOD OF STEEL SHEET PILE
European Patent Office | 2022
|European Patent Office | 2015
|European Patent Office | 2021
|