A platform for research: civil engineering, architecture and urbanism
Green and energy-saving DDC pile foundation construction method
The invention relates to the technical field of engineering construction, in particular to a DDC pile foundation construction method based on green energy conservation. The method comprises the following steps: S1, exploration and design: carrying out geological exploration on a construction area, evaluating the bearing capacity and the settlement characteristic of a pile foundation, and designing the specification, the shape, the arrangement and the construction scheme of the pile foundation; s2, a construction preparation procedure is conducted, specifically, site leveling is conducted firstly, low-energy-consumption, low-noise and low-emission DDC construction equipment is selected, high-strength and renewable building materials are adopted, and a construction site is reasonably planned; compared with a traditional technology, the green and energy-saving DDC pile foundation construction method is high in construction efficiency, the construction efficiency can be greatly improved, the construction period is shortened, manual machine matching for soil filling and heavy hammer tamping are adopted, the uniformity and compactness of soil filling can be controlled, the construction quality can be ensured, the soil filling cost can be reduced, and the construction period is shortened. Therefore, the construction method has wide application prospects and market value, and the purpose of environment-friendly, efficient and safe construction is achieved.
本发明涉及工程施工技术领域,尤其涉及基于绿色节能的DDC桩基施工方法。本发明包括以下步骤:S1:勘察与设计,对施工区域进行地质勘察,评估桩基的承载能力和沉降特性,设计桩基规格、形状、布置和施工方案;S2:施工准备工序,先进行场地平整,选择低能耗、低噪音、低排放的DDC施工设备,采用高强度、可再生的建筑材料,合理规划施工现场。本发明提出的基于绿色节能的DDC桩基施工方法,相较于传统技术施工效率高,能够大幅提高施工效率,降低施工周期,采用人工配机填土和重锤夯实,能够控制填土的均匀性和密实度,确保施工质量,能够降低填土成本,从而具有广泛的应用前景和市场价值,以实现环保、高效、安全的施工目的。
Green and energy-saving DDC pile foundation construction method
The invention relates to the technical field of engineering construction, in particular to a DDC pile foundation construction method based on green energy conservation. The method comprises the following steps: S1, exploration and design: carrying out geological exploration on a construction area, evaluating the bearing capacity and the settlement characteristic of a pile foundation, and designing the specification, the shape, the arrangement and the construction scheme of the pile foundation; s2, a construction preparation procedure is conducted, specifically, site leveling is conducted firstly, low-energy-consumption, low-noise and low-emission DDC construction equipment is selected, high-strength and renewable building materials are adopted, and a construction site is reasonably planned; compared with a traditional technology, the green and energy-saving DDC pile foundation construction method is high in construction efficiency, the construction efficiency can be greatly improved, the construction period is shortened, manual machine matching for soil filling and heavy hammer tamping are adopted, the uniformity and compactness of soil filling can be controlled, the construction quality can be ensured, the soil filling cost can be reduced, and the construction period is shortened. Therefore, the construction method has wide application prospects and market value, and the purpose of environment-friendly, efficient and safe construction is achieved.
本发明涉及工程施工技术领域,尤其涉及基于绿色节能的DDC桩基施工方法。本发明包括以下步骤:S1:勘察与设计,对施工区域进行地质勘察,评估桩基的承载能力和沉降特性,设计桩基规格、形状、布置和施工方案;S2:施工准备工序,先进行场地平整,选择低能耗、低噪音、低排放的DDC施工设备,采用高强度、可再生的建筑材料,合理规划施工现场。本发明提出的基于绿色节能的DDC桩基施工方法,相较于传统技术施工效率高,能够大幅提高施工效率,降低施工周期,采用人工配机填土和重锤夯实,能够控制填土的均匀性和密实度,确保施工质量,能够降低填土成本,从而具有广泛的应用前景和市场价值,以实现环保、高效、安全的施工目的。
Green and energy-saving DDC pile foundation construction method
基于绿色节能的DDC桩基施工方法
YOU JINGE (author) / YANG XIAOMING (author) / LI WEI (author) / DU JIANXI (author) / ZOU HAITAO (author) / WANG PAN (author) / LYU FEI (author) / LIU LING (author) / ZHANG XIUZHI (author) / CHEN YANGE (author)
2023-10-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Energy-saving pile foundation and construction method thereof
European Patent Office | 2021
|European Patent Office | 2023
|European Patent Office | 2023
European Patent Office | 2015
|European Patent Office | 2023
|