A platform for research: civil engineering, architecture and urbanism
The pile driver for building construction comprises a base, a clamping groove and a bearing seat, a through hole is formed in the base, a protective cover is arranged in the through hole, a first pile hammer is arranged in the protective cover, and a guide assembly is connected to the side wall of the protective cover; the guide assembly is connected with the auxiliary moving mechanism through a first belt transmission structure. According to the pile driver for building construction, when the pile driver needs to be moved, a worker can operate a control panel to control a first motor in an auxiliary moving mechanism to drive a second lead screw to rotate, and therefore a lead screw sliding block can move inwards to push a mounting plate and universal self-locking wheels at the bottom of the mounting plate to move downwards and stretch out of a base; the base is jacked upwards through the downwards-moving universal self-locking wheels till the positioning rod is pulled out of the ground, then the position of the device can be movably adjusted through the universal self-locking wheels, in the same way, when the device moves to the designated position, a worker can control a first motor to drive a second lead screw to rotate reversely, and therefore the universal self-locking wheels can be stored in the base.
本发明公开了一种建筑施工用打桩机,包括基座、卡槽和承载座,所述基座内开设有通孔,且通孔内设置有防护罩,所述防护罩内部设置有第一桩锤,且防护罩的侧壁上连接有导向组件,所述导向组件通过第一皮带传动结构与辅助移动机构连接。本发明的建筑施工用打桩机,当装置需要移动时工作人员可操作控制面板控制辅助移动机构中的第一电机驱动第二丝杠旋转,从而可使丝杠滑块内移推动安装板及其底部的万向自锁轮下移从基座内伸出,下移的万向自锁轮将基座向上顶升直至将定位杆从地面拔出,进而即可利用万向自锁轮将装置的位置进行移动调节,同理当装置移动至指定位置时工作人员可控制第一电机驱动第二丝杠反向旋转,从而即可将万向自锁轮收纳至基座内。
The pile driver for building construction comprises a base, a clamping groove and a bearing seat, a through hole is formed in the base, a protective cover is arranged in the through hole, a first pile hammer is arranged in the protective cover, and a guide assembly is connected to the side wall of the protective cover; the guide assembly is connected with the auxiliary moving mechanism through a first belt transmission structure. According to the pile driver for building construction, when the pile driver needs to be moved, a worker can operate a control panel to control a first motor in an auxiliary moving mechanism to drive a second lead screw to rotate, and therefore a lead screw sliding block can move inwards to push a mounting plate and universal self-locking wheels at the bottom of the mounting plate to move downwards and stretch out of a base; the base is jacked upwards through the downwards-moving universal self-locking wheels till the positioning rod is pulled out of the ground, then the position of the device can be movably adjusted through the universal self-locking wheels, in the same way, when the device moves to the designated position, a worker can control a first motor to drive a second lead screw to rotate reversely, and therefore the universal self-locking wheels can be stored in the base.
本发明公开了一种建筑施工用打桩机,包括基座、卡槽和承载座,所述基座内开设有通孔,且通孔内设置有防护罩,所述防护罩内部设置有第一桩锤,且防护罩的侧壁上连接有导向组件,所述导向组件通过第一皮带传动结构与辅助移动机构连接。本发明的建筑施工用打桩机,当装置需要移动时工作人员可操作控制面板控制辅助移动机构中的第一电机驱动第二丝杠旋转,从而可使丝杠滑块内移推动安装板及其底部的万向自锁轮下移从基座内伸出,下移的万向自锁轮将基座向上顶升直至将定位杆从地面拔出,进而即可利用万向自锁轮将装置的位置进行移动调节,同理当装置移动至指定位置时工作人员可控制第一电机驱动第二丝杠反向旋转,从而即可将万向自锁轮收纳至基座内。
Pile driver for building construction
一种建筑施工用打桩机
PANG SHUJUN (author)
2023-10-13
Patent
Electronic Resource
Chinese