A platform for research: civil engineering, architecture and urbanism
Pile driver for building construction
The invention provides a pile driver for building construction, and relates to the field of building machinery. The pile driver for building construction comprises a mounting plate, a pile driving mechanism is arranged at the center of the upper surface of the mounting plate, and the pile driving mechanism comprises a protection box. According to the device, the servo motor is arranged, the upper end of a pile body is placed in the middle of the two clamping plates, then the movable plate is moved through the electric sliding block, so that the movable plate drives the clamping plates to move oppositely, the clamping plates clamp the upper end of the pile body through the roller, and then when the pile body is hammered by the pile hammer, the upper end of the pile body is hammered through the roller. And a servo motor drives a driving gear to rotate, so that the driving gear is meshed with a gear disc, the gear disc drives a clamping plate to rotate by 90 degrees in a reciprocating manner, a pile body is clamped and fixed through the clamping plate and a roller, and the problem that the pile body possibly inclines slightly when the pile body is hammered by a pile hammer is avoided.
本发明提供一种建筑施工用打桩机,涉及建筑机械领域。该建筑施工用打桩机,包括安装板,所述安装板上表面的中心处设置有打桩机构,所述打桩机构包括防护盒。本发明中,通过设置的伺服电机,将桩体的上端放入两个夹持板的中部,然后通过电动滑块活动板进行移动,从而使活动板均带动夹持板进行相向移动,从而使夹持板通过辊筒将桩体的上端进行夹持住,然后在桩锤对桩体进行捶打时,使伺服电机带动主动齿轮进行旋转,从而使主动齿轮与齿轮盘进行啮合,从而使齿轮盘带动夹持板进行呈90度往复旋转,从而通过夹持板和辊筒将桩体进行夹持固定,避免了桩锤对桩体进行捶打时可能使桩体进行轻微倾斜的问题。
Pile driver for building construction
The invention provides a pile driver for building construction, and relates to the field of building machinery. The pile driver for building construction comprises a mounting plate, a pile driving mechanism is arranged at the center of the upper surface of the mounting plate, and the pile driving mechanism comprises a protection box. According to the device, the servo motor is arranged, the upper end of a pile body is placed in the middle of the two clamping plates, then the movable plate is moved through the electric sliding block, so that the movable plate drives the clamping plates to move oppositely, the clamping plates clamp the upper end of the pile body through the roller, and then when the pile body is hammered by the pile hammer, the upper end of the pile body is hammered through the roller. And a servo motor drives a driving gear to rotate, so that the driving gear is meshed with a gear disc, the gear disc drives a clamping plate to rotate by 90 degrees in a reciprocating manner, a pile body is clamped and fixed through the clamping plate and a roller, and the problem that the pile body possibly inclines slightly when the pile body is hammered by a pile hammer is avoided.
本发明提供一种建筑施工用打桩机,涉及建筑机械领域。该建筑施工用打桩机,包括安装板,所述安装板上表面的中心处设置有打桩机构,所述打桩机构包括防护盒。本发明中,通过设置的伺服电机,将桩体的上端放入两个夹持板的中部,然后通过电动滑块活动板进行移动,从而使活动板均带动夹持板进行相向移动,从而使夹持板通过辊筒将桩体的上端进行夹持住,然后在桩锤对桩体进行捶打时,使伺服电机带动主动齿轮进行旋转,从而使主动齿轮与齿轮盘进行啮合,从而使齿轮盘带动夹持板进行呈90度往复旋转,从而通过夹持板和辊筒将桩体进行夹持固定,避免了桩锤对桩体进行捶打时可能使桩体进行轻微倾斜的问题。
Pile driver for building construction
一种建筑施工用打桩机
LIU HENGJING (author) / XIONG ZHONG (author) / XIAO YI (author) / YANG LI (author) / AO FENGXIANG (author) / CHEN YINGYING (author) / LI FAJIN (author) / LI QUANLI (author) / LI WEN (author) / ZHU JIANZHONG (author)
2024-03-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen