A platform for research: civil engineering, architecture and urbanism
Slip form pouring system for bridge reinforced concrete guardrail construction
The invention relates to a slip form pouring system for bridge reinforced concrete guardrail construction, the slip form pouring system comprises a slip form machine body and a pouring mold fixedly arranged on the slip form machine body, a rack is fixedly arranged at the rear end of the slip form machine body, a winding roller is rotatably arranged on the rack, geotechnical cloth is wound on the winding roller, and the pouring mold is fixedly arranged on the slip form machine body. A first driving source for driving the winding roller to rotate is arranged on the rack; a cloth paving mold is fixedly arranged on the machine frame, the cloth paving mold is matched with a concrete guardrail, the cloth paving mold is used for covering the concrete guardrail, and a cloth paving mechanism used for paving geotechnical cloth on the formed concrete guardrail is arranged on the machine frame and located at the front end of the cloth paving mold. The rack is further provided with a water spraying assembly used for spraying water to the surface of the laid geotechnical cloth. The construction method has the effects of reducing the labor intensity of constructors and improving the construction efficiency.
本申请涉及一种桥梁钢筋混凝土护栏施工用滑模浇筑系统,其包括滑模机本体以及固定设置在滑模机本体上的浇筑模具,所述滑模机本体的后端固定设置有机架,所述机架上转动设置有收卷辊,所述收卷辊上绕设有土工布,所述机架上设置有用于驱使收卷辊转动的第一驱动源;所述机架上固定设置有铺布模具,所述铺布模具与混凝土护栏相适配,所述铺布模具用于罩设在混凝土护栏上,所述机架上且位于铺布模具的前端设置有用于将土工布铺设在成型混凝土护栏上的铺布机构,所述机架上还设置有用于对铺设好的土工布表面进行洒水的洒水组件。本申请具有降低施工人员的劳动强度并提高施工效率的效果。
Slip form pouring system for bridge reinforced concrete guardrail construction
The invention relates to a slip form pouring system for bridge reinforced concrete guardrail construction, the slip form pouring system comprises a slip form machine body and a pouring mold fixedly arranged on the slip form machine body, a rack is fixedly arranged at the rear end of the slip form machine body, a winding roller is rotatably arranged on the rack, geotechnical cloth is wound on the winding roller, and the pouring mold is fixedly arranged on the slip form machine body. A first driving source for driving the winding roller to rotate is arranged on the rack; a cloth paving mold is fixedly arranged on the machine frame, the cloth paving mold is matched with a concrete guardrail, the cloth paving mold is used for covering the concrete guardrail, and a cloth paving mechanism used for paving geotechnical cloth on the formed concrete guardrail is arranged on the machine frame and located at the front end of the cloth paving mold. The rack is further provided with a water spraying assembly used for spraying water to the surface of the laid geotechnical cloth. The construction method has the effects of reducing the labor intensity of constructors and improving the construction efficiency.
本申请涉及一种桥梁钢筋混凝土护栏施工用滑模浇筑系统,其包括滑模机本体以及固定设置在滑模机本体上的浇筑模具,所述滑模机本体的后端固定设置有机架,所述机架上转动设置有收卷辊,所述收卷辊上绕设有土工布,所述机架上设置有用于驱使收卷辊转动的第一驱动源;所述机架上固定设置有铺布模具,所述铺布模具与混凝土护栏相适配,所述铺布模具用于罩设在混凝土护栏上,所述机架上且位于铺布模具的前端设置有用于将土工布铺设在成型混凝土护栏上的铺布机构,所述机架上还设置有用于对铺设好的土工布表面进行洒水的洒水组件。本申请具有降低施工人员的劳动强度并提高施工效率的效果。
Slip form pouring system for bridge reinforced concrete guardrail construction
一桥梁钢筋混凝土护栏施工用滑模浇筑系统
WANG LINGFENG (author) / DENG JIAWEI (author) / WANG JUNZHANG (author) / XU YU (author) / ZHAO SONGLIN (author) / LIAO BO (author) / WANG WEI (author) / ZHANG DEJIAN (author) / LI HONGCHAO (author) / ZHAO QI (author)
2023-10-24
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Slip-form construction equipment for bridge concrete guardrail
European Patent Office | 2021
|Pull type concrete slip form machine for bridge guardrail
European Patent Office | 2022
|Slip form construction method for bridge anti-collision guardrail
European Patent Office | 2023
|