A platform for research: civil engineering, architecture and urbanism
Flood-fighting and emergency rescue guard pile
The invention provides a flood-fighting and emergency rescue protection pile, relates to the technical field of flood-fighting protection piles, and aims to solve the problems that the arrangement height of the flood-fighting and emergency rescue protection pile is limited, the flood-fighting and emergency rescue protection pile is difficult to adjust according to actual needs, labor hours are easy to waste, and when the protection pile is withdrawn, all parts need to be dismantled in sequence, and time and labor are wasted. A vertical pile main body is fixedly mounted at the edge of the rear end of the top plane of the base in a vertically upward manner; an adjusting pull seat is vertically mounted at the front end of the vertical pile main body in a sliding manner; limiting stop frames are longitudinally and fixedly mounted in the middles of the side walls of the left end and the right end of the vertical pile body. The protection height can be set according to needs, working hours are saved, the flood control and emergency rescue efficiency is improved, when the flood control and emergency rescue protection pile needs to be withdrawn, only the connecting rod needs to be pulled backwards, the effect of rapidly removing sand is achieved, and the withdrawing efficiency of the protection pile is improved.
本发明提供一种抗洪抢险防护桩,涉及抗洪防护桩技术领域,以解决抗洪抢险防护桩的布置高度受到限制,难以根据实际需要进行调整,易出现浪费工时的情况,而且在防护桩撤出时,需要依次将各个部件拆除,费时费力的问题,包括:底座;所述底座顶部平面的后端棱边处垂直向上固定安装有立桩主体;所述立桩主体的前端竖向滑动安装有调整拉座;所述立桩主体左右两端侧壁的中部位置处纵向固定安装有限位止挡架。本发明可根据需要设定防护高度,节约工时,提高防洪抢险效率,而在需要撤出防洪抢险保护桩时,只需要向后拉动连接杆,达到快速清沙的效果,提高了防护桩的撤出效率。
Flood-fighting and emergency rescue guard pile
The invention provides a flood-fighting and emergency rescue protection pile, relates to the technical field of flood-fighting protection piles, and aims to solve the problems that the arrangement height of the flood-fighting and emergency rescue protection pile is limited, the flood-fighting and emergency rescue protection pile is difficult to adjust according to actual needs, labor hours are easy to waste, and when the protection pile is withdrawn, all parts need to be dismantled in sequence, and time and labor are wasted. A vertical pile main body is fixedly mounted at the edge of the rear end of the top plane of the base in a vertically upward manner; an adjusting pull seat is vertically mounted at the front end of the vertical pile main body in a sliding manner; limiting stop frames are longitudinally and fixedly mounted in the middles of the side walls of the left end and the right end of the vertical pile body. The protection height can be set according to needs, working hours are saved, the flood control and emergency rescue efficiency is improved, when the flood control and emergency rescue protection pile needs to be withdrawn, only the connecting rod needs to be pulled backwards, the effect of rapidly removing sand is achieved, and the withdrawing efficiency of the protection pile is improved.
本发明提供一种抗洪抢险防护桩,涉及抗洪防护桩技术领域,以解决抗洪抢险防护桩的布置高度受到限制,难以根据实际需要进行调整,易出现浪费工时的情况,而且在防护桩撤出时,需要依次将各个部件拆除,费时费力的问题,包括:底座;所述底座顶部平面的后端棱边处垂直向上固定安装有立桩主体;所述立桩主体的前端竖向滑动安装有调整拉座;所述立桩主体左右两端侧壁的中部位置处纵向固定安装有限位止挡架。本发明可根据需要设定防护高度,节约工时,提高防洪抢险效率,而在需要撤出防洪抢险保护桩时,只需要向后拉动连接杆,达到快速清沙的效果,提高了防护桩的撤出效率。
Flood-fighting and emergency rescue guard pile
一种抗洪抢险防护桩
ZHANG LISHI (author) / WANG JINDONG (author) / LI XIN (author) / WANG BAO (author) / CHEN KAI (author) / JIN JIANCHENG (author) / ZHU YAO (author) / ZHOU XINGYU (author) / CHEN ZHONG (author) / GENG RUI (author)
2023-10-27
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Siphon-method flood-fighting and emergency rescue device
European Patent Office | 2020
|Stone dumper suitable for flood fighting and emergency rescue of inland lake
European Patent Office | 2024
|