A platform for research: civil engineering, architecture and urbanism
Mixed dumping site and mixed dumping method thereof
The invention relates to a mixed dumping site which comprises a bed rock, a rock core, a rock core, a rock core and a rock core, wherein the bed rock is arranged at the bottom of the dumping site; the bottom seepage layer is arranged on the bed rock and used for draining seepage and collecting catchment on the surface of the waste dump; the rock layer is stacked on the upper layer of the bottom seepage layer; the mixed discharging layer is stacked on the rock layer and comprises a weathered soil layer, center rock walls, a block stone layer, an isolation layer and a water filtering layer, a space is reserved between every two adjacent center rock walls to form a groove, the water filtering layer is arranged at the bottom of the groove, the weathered soil layer and the block stone layer are stacked in the two sides of the groove respectively, and the isolation layer is arranged between the weathered soil layer and the block stone layer. The weathered soil layers and the block stone layers in every two adjacent grooves are stacked in a staggered mode, and the isolation layer is arranged in front of the weathered soil layers and the block stone layers which are stacked. In addition, the invention further relates to a mixed dumping method of the mixed dumping site. The comprehensive utilization rate of the waste dump can be increased, the stability of the waste dump is guaranteed, and seepage drainage is not affected.
本发明涉及一种混合排土场,包括:基岩,其设置在排土场的底部;底渗层,其设置在基岩上且用以排渗及收集排土场表面汇水;岩石层,其堆排于底渗层的上层;混排层,其堆排于岩石层的上层,混排层包括风化土层、中心岩墙、块石层、隔离层和滤水层,其中每相邻两个中心岩墙的中间预留空间以形成沟槽,滤水层设置在沟槽的底部,风化土层与块石层分别堆排在沟槽的两侧内,并且相邻两个沟槽中的风化土层和块石层交错堆放,隔离层设置在堆排完成的风化土层与块石层的前部。此外,本发明还涉及一种混合排土场的混排方法。本发明能够提高排土场综合利用率并且保证排土场稳定性和排渗不受影响。
Mixed dumping site and mixed dumping method thereof
The invention relates to a mixed dumping site which comprises a bed rock, a rock core, a rock core, a rock core and a rock core, wherein the bed rock is arranged at the bottom of the dumping site; the bottom seepage layer is arranged on the bed rock and used for draining seepage and collecting catchment on the surface of the waste dump; the rock layer is stacked on the upper layer of the bottom seepage layer; the mixed discharging layer is stacked on the rock layer and comprises a weathered soil layer, center rock walls, a block stone layer, an isolation layer and a water filtering layer, a space is reserved between every two adjacent center rock walls to form a groove, the water filtering layer is arranged at the bottom of the groove, the weathered soil layer and the block stone layer are stacked in the two sides of the groove respectively, and the isolation layer is arranged between the weathered soil layer and the block stone layer. The weathered soil layers and the block stone layers in every two adjacent grooves are stacked in a staggered mode, and the isolation layer is arranged in front of the weathered soil layers and the block stone layers which are stacked. In addition, the invention further relates to a mixed dumping method of the mixed dumping site. The comprehensive utilization rate of the waste dump can be increased, the stability of the waste dump is guaranteed, and seepage drainage is not affected.
本发明涉及一种混合排土场,包括:基岩,其设置在排土场的底部;底渗层,其设置在基岩上且用以排渗及收集排土场表面汇水;岩石层,其堆排于底渗层的上层;混排层,其堆排于岩石层的上层,混排层包括风化土层、中心岩墙、块石层、隔离层和滤水层,其中每相邻两个中心岩墙的中间预留空间以形成沟槽,滤水层设置在沟槽的底部,风化土层与块石层分别堆排在沟槽的两侧内,并且相邻两个沟槽中的风化土层和块石层交错堆放,隔离层设置在堆排完成的风化土层与块石层的前部。此外,本发明还涉及一种混合排土场的混排方法。本发明能够提高排土场综合利用率并且保证排土场稳定性和排渗不受影响。
Mixed dumping site and mixed dumping method thereof
一种混合排土场及其混排方法
LI DE (author) / XIA XIANGSHENG (author) / MA TAO (author) / QIAN YUBIAO (author) / CUN YINHUA (author)
2023-11-03
Patent
Electronic Resource
Chinese
Internal dumping site rolling type earth dam construction process based on reverse dumping
European Patent Office | 2022
|