Reinforced concrete well chamber cast-in-place construction method for well chamber construction site dispersion
The invention discloses a reinforced concrete well chamber cast-in-place construction method for dispersed well chamber construction sites, and aims to solve the problems that a large number of reinforced concrete well chambers exist in the situations of municipal pipelines, factory underground pipe networks and the like, and the construction sites of the well chambers are dispersed, so that the condition that multiple well chambers are poured at the same time is not provided. A bottom plate of a target reinforced concrete well chamber is firstly constructed, then a well chamber inner formwork and a well chamber outer formwork are built, a matched supporting system is installed, finally, concrete in a bucket is unloaded onto the matched supporting system through an excavator, and the concrete is guided into a formwork cavity through the matched supporting system. Cast-in-place pouring forming of the target reinforced concrete well chamber is achieved; the method has the advantages that the operability is high, the pouring efficiency is high, the construction cost is low, the construction flexibility is high, and the pouring construction is not limited by the conditions such as the pouring number of the target reinforced concrete well chamber and the concrete dosage.
本发明公开了一种用于井室施工现场分散的钢筋混凝土井室现浇施工方法,针对市政管线、工厂地下管网等情境存在大量钢筋混凝土井室,且井室的施工现场分散,导致不具备多个井室同时浇筑的条件的情况,通过先进行目标钢筋混凝土井室的底板的施工,再搭建井室内模板和井室外模板,并安装配套支撑体系,最后用挖掘机将铲斗内的混凝土卸落于配套支撑体系上,由配套支撑体系将混凝土引导到模板腔内,实现目标钢筋混凝土井室的现浇浇筑成型;本发明具有可操作性强、浇筑效率高、施工成本低、施工灵活性高、浇筑施工不受目标钢筋混凝土井室浇筑数量及混凝土用量等条件的限制的优点。
Reinforced concrete well chamber cast-in-place construction method for well chamber construction site dispersion
The invention discloses a reinforced concrete well chamber cast-in-place construction method for dispersed well chamber construction sites, and aims to solve the problems that a large number of reinforced concrete well chambers exist in the situations of municipal pipelines, factory underground pipe networks and the like, and the construction sites of the well chambers are dispersed, so that the condition that multiple well chambers are poured at the same time is not provided. A bottom plate of a target reinforced concrete well chamber is firstly constructed, then a well chamber inner formwork and a well chamber outer formwork are built, a matched supporting system is installed, finally, concrete in a bucket is unloaded onto the matched supporting system through an excavator, and the concrete is guided into a formwork cavity through the matched supporting system. Cast-in-place pouring forming of the target reinforced concrete well chamber is achieved; the method has the advantages that the operability is high, the pouring efficiency is high, the construction cost is low, the construction flexibility is high, and the pouring construction is not limited by the conditions such as the pouring number of the target reinforced concrete well chamber and the concrete dosage.
本发明公开了一种用于井室施工现场分散的钢筋混凝土井室现浇施工方法,针对市政管线、工厂地下管网等情境存在大量钢筋混凝土井室,且井室的施工现场分散,导致不具备多个井室同时浇筑的条件的情况,通过先进行目标钢筋混凝土井室的底板的施工,再搭建井室内模板和井室外模板,并安装配套支撑体系,最后用挖掘机将铲斗内的混凝土卸落于配套支撑体系上,由配套支撑体系将混凝土引导到模板腔内,实现目标钢筋混凝土井室的现浇浇筑成型;本发明具有可操作性强、浇筑效率高、施工成本低、施工灵活性高、浇筑施工不受目标钢筋混凝土井室浇筑数量及混凝土用量等条件的限制的优点。
Reinforced concrete well chamber cast-in-place construction method for well chamber construction site dispersion
用于井室施工现场分散的钢筋混凝土井室现浇施工方法
DU HONGBIN (author) / SHI YULING (author) / ZHANG YONGDONG (author)
2023-11-03
Patent
Electronic Resource
Chinese
Cast-in-place concrete inspection well construction technology
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2021
|Cast-in-place concrete cable well integral outer mold construction method
European Patent Office | 2022
|