A platform for research: civil engineering, architecture and urbanism
Construction method of combined reinforced concrete stand column and combined steel plate shear wall
The invention discloses a construction method of a combined reinforced concrete stand column and a combined steel plate shear wall, a stand column steel structure comprises a column steel pipe, a reinforcing plate, a column steel bar, a socket plate and a butt joint pipe, the reinforcing plate is installed in the upper end of the column steel pipe, the lower end of the column steel bar is connected with the reinforcing plate, and the upper end of the column steel bar penetrates out of the upper end of the column steel pipe; the lower end of the butt-joint pipe is sleeved with the column steel pipe, the upper end of the butt-joint pipe penetrates out of the upper end of the column steel pipe, the outer wall of the butt-joint pipe abuts against the inner wall of the column steel pipe, connecting holes are formed in the peripheral wall of the lower end of the column steel pipe, butt-joint holes are formed in the portion, penetrating out of the column steel pipe, of the butt-joint pipe, and when two column steel structures are in butt joint, the connecting holes are aligned with the butt-joint holes. After the upper column steel structure and the lower column steel structure are in butt joint, the column steel pipes and the butt joint pipes of the different stand column steel structures are fixedly connected through the bolts and the nuts, connection of the stand column steel structures is completed, alignment is convenient and fast, welding is not needed for connection of the stand column steel structures, the workload of high-altitude welding is reduced, and the construction efficiency is improved.
本申请公开了一种组合钢混立柱及组合钢板剪力墙的施工方法,其中立柱钢结构包括柱钢管、加强板、柱钢筋、承插板和对接管,加强板安装于柱钢管的上端内,柱钢筋的下端连接加强板,柱钢筋的上端穿出柱钢管的上端,对接管的下端套设于柱钢管内,对接管的上端穿出柱钢管的上端,对接管的外壁抵接柱钢管的内壁,柱钢管的下端的周壁设有连接孔,对接管穿出柱钢管的部分设有对接孔,两根立柱钢结构对接时,连接孔和对接孔对齐。上下两段柱钢结构对接在一起后,再使用螺栓和螺母将不同立柱钢结构的柱钢管和对接管固定连接,即完成立柱钢结构的连接,对位方便快捷,立柱钢结构的连接无需焊接,减少高空焊接的工作量,提高施工效率。
Construction method of combined reinforced concrete stand column and combined steel plate shear wall
The invention discloses a construction method of a combined reinforced concrete stand column and a combined steel plate shear wall, a stand column steel structure comprises a column steel pipe, a reinforcing plate, a column steel bar, a socket plate and a butt joint pipe, the reinforcing plate is installed in the upper end of the column steel pipe, the lower end of the column steel bar is connected with the reinforcing plate, and the upper end of the column steel bar penetrates out of the upper end of the column steel pipe; the lower end of the butt-joint pipe is sleeved with the column steel pipe, the upper end of the butt-joint pipe penetrates out of the upper end of the column steel pipe, the outer wall of the butt-joint pipe abuts against the inner wall of the column steel pipe, connecting holes are formed in the peripheral wall of the lower end of the column steel pipe, butt-joint holes are formed in the portion, penetrating out of the column steel pipe, of the butt-joint pipe, and when two column steel structures are in butt joint, the connecting holes are aligned with the butt-joint holes. After the upper column steel structure and the lower column steel structure are in butt joint, the column steel pipes and the butt joint pipes of the different stand column steel structures are fixedly connected through the bolts and the nuts, connection of the stand column steel structures is completed, alignment is convenient and fast, welding is not needed for connection of the stand column steel structures, the workload of high-altitude welding is reduced, and the construction efficiency is improved.
本申请公开了一种组合钢混立柱及组合钢板剪力墙的施工方法,其中立柱钢结构包括柱钢管、加强板、柱钢筋、承插板和对接管,加强板安装于柱钢管的上端内,柱钢筋的下端连接加强板,柱钢筋的上端穿出柱钢管的上端,对接管的下端套设于柱钢管内,对接管的上端穿出柱钢管的上端,对接管的外壁抵接柱钢管的内壁,柱钢管的下端的周壁设有连接孔,对接管穿出柱钢管的部分设有对接孔,两根立柱钢结构对接时,连接孔和对接孔对齐。上下两段柱钢结构对接在一起后,再使用螺栓和螺母将不同立柱钢结构的柱钢管和对接管固定连接,即完成立柱钢结构的连接,对位方便快捷,立柱钢结构的连接无需焊接,减少高空焊接的工作量,提高施工效率。
Construction method of combined reinforced concrete stand column and combined steel plate shear wall
一种组合钢混立柱及组合钢板剪力墙的施工方法
LI RONG (author) / LI MING (author) / ZHONG GUANGHUI (author) / LONG JIANWEN (author)
2023-11-03
Patent
Electronic Resource
Chinese
Concrete filled steel tube column combined shear wall and construction method
European Patent Office | 2020
|Steel plate and concrete combined shear wall and construction method thereof
European Patent Office | 2021
|Construction process of prefabricated double-steel-plate-concrete combined shear wall
European Patent Office | 2021
|Steel and concrete combined shear wall and construction method
European Patent Office | 2023
|Multi-cavity pouring concrete steel plate combined shear wall foundation construction device
European Patent Office | 2024
|