Splicing type water well prefabricated part and using method thereof
The invention discloses a spliced water well prefabricated part and a using method thereof, belongs to the field of environmental engineering, and can solve the problems that in the background technology, a common water well is usually formed by stacking multiple layers of well bricks, upper and lower layers of hollow bricks are bonded and fixed through engineering bonding materials such as concrete, resources are wasted, the construction procedure is complex, the construction period is long, and the construction cost is high. And the construction is limited by weather and seasons, for example, in northeast China, the construction cannot be carried out in cold winter. The method comprises the steps that firstly, the device is sequentially placed in a dug foundation pit, an inserting plate of a prefabricated part located at the upper end is inserted into a long groove of a prefabricated part located at the lower end, an L-shaped rod rotates towards the interior of the inserting plate, and a buckle is clamped on a clamping block to complete fixed connection; and secondly, the two-way screw rod is rotated to drive the two sliding blocks to move relatively, and the two sliding blocks move relatively to drive the top plate to move towards the outer side through the two connecting columns to abut against the inner wall of the foundation pit for position adjustment.
一种拼接式水井预制件及其使用方法,环境工程领域,可以解决背景技术中提出的:常用的水井通常由多层井砖堆砌而成,上下两层空心砖之间是通过混凝土等工程粘接材料粘结固定,浪费资源,施工程序复杂工期长,而且施工还受气候、季节的限制,例如,在东北地区,冬天比较寒冷,无法进行施工的问题。步骤为:步骤一:将本装置依次放置在挖好的基坑内,将位于上端的预制件的插接板,插入位于下端预制件的长槽内,L形杆向插接板内转动,使扣卡在卡块上完成固定连接;步骤二:转动双向螺杆带动两个滑块相对移动,两个滑块相对移动通过两个连接柱带动顶板向外侧移动顶靠在基坑的内壁上进行位置调节。
Splicing type water well prefabricated part and using method thereof
The invention discloses a spliced water well prefabricated part and a using method thereof, belongs to the field of environmental engineering, and can solve the problems that in the background technology, a common water well is usually formed by stacking multiple layers of well bricks, upper and lower layers of hollow bricks are bonded and fixed through engineering bonding materials such as concrete, resources are wasted, the construction procedure is complex, the construction period is long, and the construction cost is high. And the construction is limited by weather and seasons, for example, in northeast China, the construction cannot be carried out in cold winter. The method comprises the steps that firstly, the device is sequentially placed in a dug foundation pit, an inserting plate of a prefabricated part located at the upper end is inserted into a long groove of a prefabricated part located at the lower end, an L-shaped rod rotates towards the interior of the inserting plate, and a buckle is clamped on a clamping block to complete fixed connection; and secondly, the two-way screw rod is rotated to drive the two sliding blocks to move relatively, and the two sliding blocks move relatively to drive the top plate to move towards the outer side through the two connecting columns to abut against the inner wall of the foundation pit for position adjustment.
一种拼接式水井预制件及其使用方法,环境工程领域,可以解决背景技术中提出的:常用的水井通常由多层井砖堆砌而成,上下两层空心砖之间是通过混凝土等工程粘接材料粘结固定,浪费资源,施工程序复杂工期长,而且施工还受气候、季节的限制,例如,在东北地区,冬天比较寒冷,无法进行施工的问题。步骤为:步骤一:将本装置依次放置在挖好的基坑内,将位于上端的预制件的插接板,插入位于下端预制件的长槽内,L形杆向插接板内转动,使扣卡在卡块上完成固定连接;步骤二:转动双向螺杆带动两个滑块相对移动,两个滑块相对移动通过两个连接柱带动顶板向外侧移动顶靠在基坑的内壁上进行位置调节。
Splicing type water well prefabricated part and using method thereof
一种拼接式水井预制件及其使用方法
LIU TAO (author) / ZHU LIN (author) / DAI WENLONG (author) / HE ZHENNAN (author) / HE YIBO (author)
2023-11-07
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Splicing type prefabricated part and construction method thereof
European Patent Office | 2024
|Prefabricated part splicing method and connecting piece for prefabricated part splicing
European Patent Office | 2023
Prefabricated assembly type building splicing plate and splicing method thereof
European Patent Office | 2022
|Splicing assembly type building concrete prefabricated part
European Patent Office | 2022
|