A platform for research: civil engineering, architecture and urbanism
Ultra-high plant roof large-diameter dust removal pipeline sliding construction assembly and method
The construction assembly comprises a pipeline bracket, a temporary support, a winch support platform, a fixed pulley, a movable pulley and a winch, the pipeline bracket, the temporary support and the winch support platform are all arranged on an old factory building roof truss and arranged at the top of an old factory building steel column, and the fixed pulley is arranged on the top of the old factory building steel column. A pipeline is arranged on the pipeline bracket, a fixed pulley and a movable pulley are arranged on the temporary support, a winch is arranged on the winch support platform, and the winch is connected through the fixed pulley and the movable pulley through a traction rope. According to the ultra-high plant roof large-diameter dust removal pipeline sliding construction assembly and method, the problems of horizontal transportation and installation of ultra-high roof pipelines are solved, so that the construction efficiency can be improved, and the cost is saved.
本发明公开了一种超高厂房屋面大直径除尘管道滑移施工组件及方法,施工组件包括管道托架、临时支架、卷扬机支架平台、定滑轮、动滑轮和卷扬机,管道托架、临时支架和卷扬机支架平台均设置于老厂房屋架上,且置于老厂房钢柱的顶部,管道置于管道托架上,临时支架上设有定滑轮和动滑轮,卷扬机支架平台上设有卷扬机,卷扬机通过定滑轮、动滑轮,采用牵引绳连接;本发明提供了一种解决超高屋面管道水平运输、安装问题,从而能够提高施工效率、节约成本的超高厂房屋面大直径除尘管道滑移施工组件及方法。
Ultra-high plant roof large-diameter dust removal pipeline sliding construction assembly and method
The construction assembly comprises a pipeline bracket, a temporary support, a winch support platform, a fixed pulley, a movable pulley and a winch, the pipeline bracket, the temporary support and the winch support platform are all arranged on an old factory building roof truss and arranged at the top of an old factory building steel column, and the fixed pulley is arranged on the top of the old factory building steel column. A pipeline is arranged on the pipeline bracket, a fixed pulley and a movable pulley are arranged on the temporary support, a winch is arranged on the winch support platform, and the winch is connected through the fixed pulley and the movable pulley through a traction rope. According to the ultra-high plant roof large-diameter dust removal pipeline sliding construction assembly and method, the problems of horizontal transportation and installation of ultra-high roof pipelines are solved, so that the construction efficiency can be improved, and the cost is saved.
本发明公开了一种超高厂房屋面大直径除尘管道滑移施工组件及方法,施工组件包括管道托架、临时支架、卷扬机支架平台、定滑轮、动滑轮和卷扬机,管道托架、临时支架和卷扬机支架平台均设置于老厂房屋架上,且置于老厂房钢柱的顶部,管道置于管道托架上,临时支架上设有定滑轮和动滑轮,卷扬机支架平台上设有卷扬机,卷扬机通过定滑轮、动滑轮,采用牵引绳连接;本发明提供了一种解决超高屋面管道水平运输、安装问题,从而能够提高施工效率、节约成本的超高厂房屋面大直径除尘管道滑移施工组件及方法。
Ultra-high plant roof large-diameter dust removal pipeline sliding construction assembly and method
一种超高厂房屋面大直径除尘管道滑移施工组件及方法
MIAO DEJIANG (author) / SHI JIEQUN (author) / LI SHILEI (author)
2023-11-07
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2023
|Synchronous construction method of steelmaking plant and roof large-diameter pipeline
European Patent Office | 2021
|European Patent Office | 2023
|High-altitude large-diameter pipeline sliding device and sliding method
European Patent Office | 2021
|Open excavation hidden roof construction method for large-pipe-diameter reinforced concrete pipeline
European Patent Office | 2023
|