Electric concealed pipe pre-buried structure and construction method thereof
The invention provides an electrical concealed piping pre-buried structure and a construction method thereof.The electrical concealed piping pre-buried structure comprises an inner side wall formwork and an outer side wall formwork, reinforcing bars are evenly arranged at the positions, close to the inner side wall formwork, between the inner side wall formwork and the outer side wall formwork, and the reinforcing bars are embedded in the inner side wall formwork. An opening of the concealed wiring box is abutted against and fixed with the inner side wall template, the concealed wiring box is connected with a wiring pipe, a filler is arranged in the concealed wiring box, concrete is poured between the inner side wall template and the outer side wall template, and one end, located in the concealed wiring box, of the wiring pipe is closed; according to the concealed wiring box fixing structure, the concealed wiring box is directly nailed on the inner side of the inner side wall formwork to complete fixation of the concealed wiring box, welding is not needed, the construction requirement is low, construction is convenient and fast, the construction period is shortened, and the construction efficiency is improved.
本发明提供一种电气暗配管预埋结构及其施工方法,电气暗配管预埋结构,包括内侧墙模板及外侧墙模板,所述内侧墙模板与外侧墙模板之间靠近所述内侧墙模板的位置均匀设置有配筋,所述暗敷线盒的开口与所述内侧墙模板相抵接固定,所述暗敷线盒上连接有配线管,所述暗敷线盒的内部设置有填充物,所述内侧墙模板与外侧墙模板之间浇筑有混凝土,所述配线管上位于所述暗敷线盒内部的一端封闭;本发明中,暗敷线盒直接装钉在内侧墙模板的内侧完成对暗敷线盒的固定,无需焊接,施工要求较低,施工便捷,缩短施工周期,提升施工效率。
Electric concealed pipe pre-buried structure and construction method thereof
The invention provides an electrical concealed piping pre-buried structure and a construction method thereof.The electrical concealed piping pre-buried structure comprises an inner side wall formwork and an outer side wall formwork, reinforcing bars are evenly arranged at the positions, close to the inner side wall formwork, between the inner side wall formwork and the outer side wall formwork, and the reinforcing bars are embedded in the inner side wall formwork. An opening of the concealed wiring box is abutted against and fixed with the inner side wall template, the concealed wiring box is connected with a wiring pipe, a filler is arranged in the concealed wiring box, concrete is poured between the inner side wall template and the outer side wall template, and one end, located in the concealed wiring box, of the wiring pipe is closed; according to the concealed wiring box fixing structure, the concealed wiring box is directly nailed on the inner side of the inner side wall formwork to complete fixation of the concealed wiring box, welding is not needed, the construction requirement is low, construction is convenient and fast, the construction period is shortened, and the construction efficiency is improved.
本发明提供一种电气暗配管预埋结构及其施工方法,电气暗配管预埋结构,包括内侧墙模板及外侧墙模板,所述内侧墙模板与外侧墙模板之间靠近所述内侧墙模板的位置均匀设置有配筋,所述暗敷线盒的开口与所述内侧墙模板相抵接固定,所述暗敷线盒上连接有配线管,所述暗敷线盒的内部设置有填充物,所述内侧墙模板与外侧墙模板之间浇筑有混凝土,所述配线管上位于所述暗敷线盒内部的一端封闭;本发明中,暗敷线盒直接装钉在内侧墙模板的内侧完成对暗敷线盒的固定,无需焊接,施工要求较低,施工便捷,缩短施工周期,提升施工效率。
Electric concealed pipe pre-buried structure and construction method thereof
电气暗配管预埋结构及其施工方法
WANG RUI (author) / FENG RILI (author) / ZHANG PO (author) / FANG HUI (author) / LI FENG (author) / JIN HUAIBO (author) / XU FAN (author) / ZHANG SHUNZHE (author)
2023-11-07
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|European Patent Office | 2021
|Construction method for bridge concealed type water drain pipe
European Patent Office | 2022
|Buried pipe structure below building foundation and drilling construction method thereof
European Patent Office | 2020
|