All-casing pore-forming secant pile construction method
The invention discloses a construction method for an all-casing pore-forming secant pile. The construction method comprises the following steps that firstly, a site is leveled; step 2, measuring and placing pile positions according to building red line control points; thirdly, a reinforced concrete guide wall is constructed on the upper portion of the pile top; fourthly, the casing drilling machine is moved to the correct position, and the center of a pipe holding device of the casing drilling machine is correspondingly positioned in the center of the guide wall hole site; fifthly, the first section of pipe is hoisted in a pile machine jaw, and the perpendicularity of the casing pipe is aligned through a plumb bob; sixthly, hole cleaning operation is conducted after hole forming is completed; seventhly, a reinforcement cage is manufactured and hoisted; and eighthly, a guide pipe and a funnel are installed, then concrete is poured, and secant pile construction is completed. According to the construction method for the all-casing pore-forming secant pile, through the arrangement of the step 3, the guide wall can be arranged before drilling, and therefore subsequent pore-forming and construction can be better guided.
本发明公开了一种全套管成孔咬合桩施工方法,包括如下步骤:步骤一,平整场地;步骤二,测放桩位,根据建筑红线控制点;步骤三,在桩顶上部施作钢筋砼导墙;步骤四,移动套管钻机至正确位置,使套管钻机抱管器中心对应定位在导墙孔位中心;步骤五,将第一节管吊装在桩机钳口中,利用线锤找正套管垂直度后;步骤六,成孔完成以后进行清孔作业;步骤七,制作并吊装钢筋笼;步骤八,安装导管和漏斗,然后浇筑砼,完成咬合桩施工。本发明的全套管成孔咬合桩施工方法,通过步骤三的设置,便可实现在钻孔之前设置好导墙了,由此便可更好的引导后续的成孔和施工了。
All-casing pore-forming secant pile construction method
The invention discloses a construction method for an all-casing pore-forming secant pile. The construction method comprises the following steps that firstly, a site is leveled; step 2, measuring and placing pile positions according to building red line control points; thirdly, a reinforced concrete guide wall is constructed on the upper portion of the pile top; fourthly, the casing drilling machine is moved to the correct position, and the center of a pipe holding device of the casing drilling machine is correspondingly positioned in the center of the guide wall hole site; fifthly, the first section of pipe is hoisted in a pile machine jaw, and the perpendicularity of the casing pipe is aligned through a plumb bob; sixthly, hole cleaning operation is conducted after hole forming is completed; seventhly, a reinforcement cage is manufactured and hoisted; and eighthly, a guide pipe and a funnel are installed, then concrete is poured, and secant pile construction is completed. According to the construction method for the all-casing pore-forming secant pile, through the arrangement of the step 3, the guide wall can be arranged before drilling, and therefore subsequent pore-forming and construction can be better guided.
本发明公开了一种全套管成孔咬合桩施工方法,包括如下步骤:步骤一,平整场地;步骤二,测放桩位,根据建筑红线控制点;步骤三,在桩顶上部施作钢筋砼导墙;步骤四,移动套管钻机至正确位置,使套管钻机抱管器中心对应定位在导墙孔位中心;步骤五,将第一节管吊装在桩机钳口中,利用线锤找正套管垂直度后;步骤六,成孔完成以后进行清孔作业;步骤七,制作并吊装钢筋笼;步骤八,安装导管和漏斗,然后浇筑砼,完成咬合桩施工。本发明的全套管成孔咬合桩施工方法,通过步骤三的设置,便可实现在钻孔之前设置好导墙了,由此便可更好的引导后续的成孔和施工了。
All-casing pore-forming secant pile construction method
全套管成孔咬合桩施工方法
LI QUANFENG (author) / FU YOUWEN (author) / ZHOU QINGXIANG (author) / WU ZUYUE (author) / LIN WEIZHEN (author) / HU QINGGUO (author) / LI WUYAN (author) / TAO YUAN (author)
2023-11-10
Patent
Electronic Resource
Chinese