A platform for research: civil engineering, architecture and urbanism
Outer wall hole multi-blocking mechanism and construction method thereof
The invention discloses an outer wall hole multi-blocking mechanism and a construction method thereof, and relates to the technical field of hole blocking, the outer wall hole multi-blocking mechanism and the construction method thereof comprise a base, universal wheels are arranged below the base, a pull rod is arranged on the right side of the top face of the base, and the outer wall hole multi-blocking mechanism further comprises a transmission mechanism and a clamping mechanism, the lifting mechanism is arranged on the rear side of the transmission mechanism; and the telescopic mechanism is arranged at the top of the lifting mechanism. According to the multiple plugging mechanism for the outer wall hole and the construction method of the multiple plugging mechanism, by arranging the telescopic mechanism, a worker can drive a second motor to enable an extrusion block to compact and flatten the hole, the step of manually operating the multiple plugging mechanism is omitted, a rotating disc rotates to enable the extrusion block to do left-right reciprocating telescopic motion, and a track plate limits a sliding block; and by means of the shell, dust is prevented from falling into the device in the hole compacting process of the extrusion block.
本发明公开了一种外墙孔洞多重封堵机构及其施工方法,涉及孔洞封堵技术领域,一种外墙孔洞多重封堵机构及其施工方法,包括底座,所述底座下方设有万向轮,所述底座顶面右侧设有拉杆,还包括:传动机构:所述传动机构设置于底座顶部;升降机构:所述升降机构设置于所述传动机构后侧;伸缩机构:所述伸缩机构设置于所述升降机构顶部。该外墙孔洞多重封堵机构及其施工方法,通过设置伸缩机构,工作人员可以通过驱动第二电机使得挤压块对孔洞进行夯实压平,免除了需要人工对其操作的步骤,其中转动盘旋转使得挤压块做左右往复伸缩运动,轨道板对滑动块进行限位,外壳使得挤压块在对孔洞压实的过程中免除灰尘掉落到装置内部。
Outer wall hole multi-blocking mechanism and construction method thereof
The invention discloses an outer wall hole multi-blocking mechanism and a construction method thereof, and relates to the technical field of hole blocking, the outer wall hole multi-blocking mechanism and the construction method thereof comprise a base, universal wheels are arranged below the base, a pull rod is arranged on the right side of the top face of the base, and the outer wall hole multi-blocking mechanism further comprises a transmission mechanism and a clamping mechanism, the lifting mechanism is arranged on the rear side of the transmission mechanism; and the telescopic mechanism is arranged at the top of the lifting mechanism. According to the multiple plugging mechanism for the outer wall hole and the construction method of the multiple plugging mechanism, by arranging the telescopic mechanism, a worker can drive a second motor to enable an extrusion block to compact and flatten the hole, the step of manually operating the multiple plugging mechanism is omitted, a rotating disc rotates to enable the extrusion block to do left-right reciprocating telescopic motion, and a track plate limits a sliding block; and by means of the shell, dust is prevented from falling into the device in the hole compacting process of the extrusion block.
本发明公开了一种外墙孔洞多重封堵机构及其施工方法,涉及孔洞封堵技术领域,一种外墙孔洞多重封堵机构及其施工方法,包括底座,所述底座下方设有万向轮,所述底座顶面右侧设有拉杆,还包括:传动机构:所述传动机构设置于底座顶部;升降机构:所述升降机构设置于所述传动机构后侧;伸缩机构:所述伸缩机构设置于所述升降机构顶部。该外墙孔洞多重封堵机构及其施工方法,通过设置伸缩机构,工作人员可以通过驱动第二电机使得挤压块对孔洞进行夯实压平,免除了需要人工对其操作的步骤,其中转动盘旋转使得挤压块做左右往复伸缩运动,轨道板对滑动块进行限位,外壳使得挤压块在对孔洞压实的过程中免除灰尘掉落到装置内部。
Outer wall hole multi-blocking mechanism and construction method thereof
一种外墙孔洞多重封堵机构及其施工方法
PAN QINGHUA (author) / MEI MENGMENG (author) / HE JUHUA (author) / FAN GUANGRUI (author) / CHEN YUJIAO (author) / TIAN ZHEN (author)
2023-11-10
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Shear wall outer wall body bolt hole blocking construction technology
European Patent Office | 2024
|Blocking construction process for fully-interspersed outer wall screw hole
European Patent Office | 2022
|European Patent Office | 2015
|