Blocking construction process for fully-interspersed outer wall screw hole
The invention discloses a plugging construction technology for a fully-interspersed outer wall screw hole, and relates to the technical field of building construction, and the plugging construction technology comprises the following steps: S1, a small rubber plug seal is driven into one side, close to an outdoor upstream face, of a wall body to plug the screw hole compactly; s2, a foaming agent is injected into the screw hole from the outdoor side of the wall body and extruded to be dense, and a filling layer is formed; s3, a large rubber plug is driven into the screw hole from the outdoor side of the wall body to seal and compact the screw hole; s4, the screw hole is plugged through the indoor side and the outdoor side of the wall body, and a plugging layer is formed; and S5, waterproof layers are brushed on the plugging layers on the indoor side and the outdoor side of the wall body. According to the invention, the plugging effect can be achieved for a long time when the high-rise building encounters rainwater, and the problem that the rainwater is easy to permeate into the holes is solved.
本申请公开一种全穿插的外墙螺杆洞的封堵施工工艺,涉及建筑施工技术领域,包括以下步骤:S1、在墙体靠近室外迎水面的一侧打入小胶塞封将螺杆洞堵密实;S2、从墙体室外的一侧向螺杆洞内打入发泡剂并挤压密实,形成填充层;S3、从墙体室外的一侧向螺杆洞内打入大胶塞将螺杆洞封堵密实;S4、墙体室内外的两侧将螺杆洞封堵,形成封堵层;S5、在墙体室内外两侧的封堵层上刷上防水层。本申请在高层建筑中遇到雨水能长时间起到封堵效果,解决了雨水容易渗透漏孔洞内的问题。
Blocking construction process for fully-interspersed outer wall screw hole
The invention discloses a plugging construction technology for a fully-interspersed outer wall screw hole, and relates to the technical field of building construction, and the plugging construction technology comprises the following steps: S1, a small rubber plug seal is driven into one side, close to an outdoor upstream face, of a wall body to plug the screw hole compactly; s2, a foaming agent is injected into the screw hole from the outdoor side of the wall body and extruded to be dense, and a filling layer is formed; s3, a large rubber plug is driven into the screw hole from the outdoor side of the wall body to seal and compact the screw hole; s4, the screw hole is plugged through the indoor side and the outdoor side of the wall body, and a plugging layer is formed; and S5, waterproof layers are brushed on the plugging layers on the indoor side and the outdoor side of the wall body. According to the invention, the plugging effect can be achieved for a long time when the high-rise building encounters rainwater, and the problem that the rainwater is easy to permeate into the holes is solved.
本申请公开一种全穿插的外墙螺杆洞的封堵施工工艺,涉及建筑施工技术领域,包括以下步骤:S1、在墙体靠近室外迎水面的一侧打入小胶塞封将螺杆洞堵密实;S2、从墙体室外的一侧向螺杆洞内打入发泡剂并挤压密实,形成填充层;S3、从墙体室外的一侧向螺杆洞内打入大胶塞将螺杆洞封堵密实;S4、墙体室内外的两侧将螺杆洞封堵,形成封堵层;S5、在墙体室内外两侧的封堵层上刷上防水层。本申请在高层建筑中遇到雨水能长时间起到封堵效果,解决了雨水容易渗透漏孔洞内的问题。
Blocking construction process for fully-interspersed outer wall screw hole
全穿插的外墙螺杆洞的封堵施工工艺
HE SHIPIN (author) / LENG WEI (author) / HAN XUECHI (author) / HUANG DAOLOU (author) / JIA QI (author) / ZHANG JIAWEI (author) / ZHAO BIAO (author)
2022-10-04
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2015
|Construction method for blocking outer wall screw hole by polyurethane foaming agent
European Patent Office | 2022
|Outer wall non-water-stop screw hole plugging construction process
European Patent Office | 2020
|