A platform for research: civil engineering, architecture and urbanism
Cast-in-place pile head breaking method
The invention relates to the field of sheet pile walls, in particular to a cast-in-place pile head breaking method which comprises an over-grouting part concrete pile and a breaking step, pile head steel bars are arranged in the over-grouting part concrete pile, steel chisels are installed on the outer wall of the over-grouting part concrete pile, and an annular dividing strip and an internal rectangular dividing strip are installed at the elevation position of the pile top of the cast-in-place pile. The tubular plastic film has the advantages that the tubular plastic film is low in manufacturing cost, the tubular plastic film can be quickly filled with air by the aid of a wind pressure machine, the tubular plastic film is simple to operate, and the tubular plastic film is more economical as compared with a traditional PVC (polyvinyl chloride) tube or foam tube sleeving manner. The inner and outer filling isolation strips are arranged at the elevation position of the pile head, the sectional area of pile body concrete is reduced, cutting construction is easier, construction is more efficient, and labor cost is reduced.
本发明涉及板桩墙领域,具体为一种灌注桩桩头破除方法,包括超灌部分混凝土桩和破解步骤,超灌部分混凝土桩里面有桩头钢筋,超灌部分混凝土桩外壁上安装有钢钎,灌注桩在桩顶标高位置安装有环向分隔条和内部矩形分隔条,固定钢筋笼的顶部安装有钢筋笼吊环,桩头钢筋的顶部连接有充气塑料保护膜,本发明中管状塑料膜造价低廉、使用风压机可以快速填充满空气,操作简单,相较传统套pvc管或泡沫管更经济。桩头标高位置设置内外填充隔离条,减少桩身混凝土截面积,使得截断施工更容易,施工更高效,减少人工成本的支出。
Cast-in-place pile head breaking method
The invention relates to the field of sheet pile walls, in particular to a cast-in-place pile head breaking method which comprises an over-grouting part concrete pile and a breaking step, pile head steel bars are arranged in the over-grouting part concrete pile, steel chisels are installed on the outer wall of the over-grouting part concrete pile, and an annular dividing strip and an internal rectangular dividing strip are installed at the elevation position of the pile top of the cast-in-place pile. The tubular plastic film has the advantages that the tubular plastic film is low in manufacturing cost, the tubular plastic film can be quickly filled with air by the aid of a wind pressure machine, the tubular plastic film is simple to operate, and the tubular plastic film is more economical as compared with a traditional PVC (polyvinyl chloride) tube or foam tube sleeving manner. The inner and outer filling isolation strips are arranged at the elevation position of the pile head, the sectional area of pile body concrete is reduced, cutting construction is easier, construction is more efficient, and labor cost is reduced.
本发明涉及板桩墙领域,具体为一种灌注桩桩头破除方法,包括超灌部分混凝土桩和破解步骤,超灌部分混凝土桩里面有桩头钢筋,超灌部分混凝土桩外壁上安装有钢钎,灌注桩在桩顶标高位置安装有环向分隔条和内部矩形分隔条,固定钢筋笼的顶部安装有钢筋笼吊环,桩头钢筋的顶部连接有充气塑料保护膜,本发明中管状塑料膜造价低廉、使用风压机可以快速填充满空气,操作简单,相较传统套pvc管或泡沫管更经济。桩头标高位置设置内外填充隔离条,减少桩身混凝土截面积,使得截断施工更容易,施工更高效,减少人工成本的支出。
Cast-in-place pile head breaking method
一种灌注桩桩头破除方法
ZHOU LI (author) / LI XIUREN (author) / LIU DINGWANG (author) / ZHOU JINGJING (author) / CHAI ZHANGPENG (author)
2023-11-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile head breaking auxiliary device for cast-in-place pile and pile head breaking method
European Patent Office | 2024
|Pile head breaking method for concrete cast-in-place pile
European Patent Office | 2024
|