Nuclear power pool room module and construction method thereof, and nuclear power plant room and construction method thereof
The invention relates to a nuclear power pool room module and a construction method thereof, and a nuclear power plant room and a construction method thereof. The construction method of the nuclear power pool room module comprises the following steps: prefabricating the bottom plate main body, the bottom plate covering surface and the room plate covering surface; the bottom plate covering surface is attached to the inner wall of the bottom plate body, and a bottom plate assembly is obtained; the house plate covering face and the bottom plate assembly are assembled; and the house board main body is poured on the outer side of the house board covering face, and the nuclear power pool room module is obtained. The construction process is carried out from inside to outside, the situation that construction facilities are frequently carried inside and outside the house board body and construction operation is influenced due to the fact that the construction space in the house board body is limited is reduced, and the construction difficulty and the construction risk of the house board covering face are greatly reduced. The method is carried out in parallel with field construction, does not occupy the field structure and decoration construction period, and greatly improves the construction efficiency.
本申请涉及一种核电水池房间模块及其建造方法、核电厂房及其建造方法。核电水池房间模块的建造方法包括:预制底板主体、底板覆面以及房板覆面;将底板覆面贴设于底板主体的内壁上,获取底板组件;将房板覆面与底板组件组装;将房板主体浇注于房板覆面的外侧,获取核电水池房间模块。本申请的施工过程由内至外进行,减少了施工设施频繁地在房板主体内外搬运以及房板主体内部施工空间受限影响施工操作,极大降低了房板覆面的施工难度和施工风险,本申请可将核电水池房间模块整体在场外制作为一整体,与现场施工并列开展,不占用现场结构与装修施工工期,极大地提高了施工效率。
Nuclear power pool room module and construction method thereof, and nuclear power plant room and construction method thereof
The invention relates to a nuclear power pool room module and a construction method thereof, and a nuclear power plant room and a construction method thereof. The construction method of the nuclear power pool room module comprises the following steps: prefabricating the bottom plate main body, the bottom plate covering surface and the room plate covering surface; the bottom plate covering surface is attached to the inner wall of the bottom plate body, and a bottom plate assembly is obtained; the house plate covering face and the bottom plate assembly are assembled; and the house board main body is poured on the outer side of the house board covering face, and the nuclear power pool room module is obtained. The construction process is carried out from inside to outside, the situation that construction facilities are frequently carried inside and outside the house board body and construction operation is influenced due to the fact that the construction space in the house board body is limited is reduced, and the construction difficulty and the construction risk of the house board covering face are greatly reduced. The method is carried out in parallel with field construction, does not occupy the field structure and decoration construction period, and greatly improves the construction efficiency.
本申请涉及一种核电水池房间模块及其建造方法、核电厂房及其建造方法。核电水池房间模块的建造方法包括:预制底板主体、底板覆面以及房板覆面;将底板覆面贴设于底板主体的内壁上,获取底板组件;将房板覆面与底板组件组装;将房板主体浇注于房板覆面的外侧,获取核电水池房间模块。本申请的施工过程由内至外进行,减少了施工设施频繁地在房板主体内外搬运以及房板主体内部施工空间受限影响施工操作,极大降低了房板覆面的施工难度和施工风险,本申请可将核电水池房间模块整体在场外制作为一整体,与现场施工并列开展,不占用现场结构与装修施工工期,极大地提高了施工效率。
Nuclear power pool room module and construction method thereof, and nuclear power plant room and construction method thereof
核电水池房间模块及其建造方法、核电厂房及其建造方法
SHEN GANG (author) / DONG ZHANFA (author) / WEI WEI (author) / WANG ZHENG (author) / LYU XINGBING (author) / LIU YU (author) / WANG XUEFENG (author) / XU NAISHENG (author) / LIU XIAOHUA (author) / WANG YONG (author)
2023-11-14